Monday, December 27, 2010
【 Weak current College 】 construction site English 500 words (17)
19. trade and drive (30 words)
TESTRUNANDSTART-UP
445Weshallputthemachinetotrial(testrun)aftertheerectionworkhasbeenfinished.
This machine is installed after the completion of the test runs. (Test run)
446ThemechanicalcompletionchecklistoftheunithasbeenapprovedbybothoftheBuyer’sandSeler’srepresentative.
This device for mechanical completion inspection table is composed of representatives of the buyer and the seller's approval.
447Weshouldstarttheinstallationaccordingtotheinstructionandoperationmanual.
We should be according to the instructions and manuals to operate this device.
448Thesystematichydrostatictest(dryrun,hottest,dynamictest,actualstart-up)isscheduledfornextMonday.
System water pressure test (learning, heating test, power test, physical drive) is scheduled for next Monday.
449WehaveplannedtofinishtheadjustmentofthemachinebeforeTuesday.
We plan to complete the machine before Tuesday's debugging work.
450Beforeinitialstart-upoftheinstallation,wemustchecktheequipmentcarefully.
In the device before the first run, we must carefully check for these devices.
451Shallwebeginthetestrunatonce?
We immediately begin test?
452Thecompressorisloadedupwiththemediumofair(nitrogen,processgas).
Compressor with air (nitrogen, process gas) load operation.
453Theturbinehadbeenrunningfor4hoursbeforecarryingafullload. turbine in full before the operation for four hours.
454Weshallsoonputthechemicalinstallationintocommissioningtestrun. (performancetest)
We will soon put the chemical plant for production of feed. (Performance assessment)
455Accordingtotheschedule,thefirstbatchprocesswillbeproducedonOctoberfirstthisyear.
According to the schedule, as from 1 October this year will be the first mass production.
456Themachineisingoodworkingorder.
The machine is running good.
457Themachineisoutoforder,willyouseetoit,please.
The machine is running, please go check look.
458Ifeltthemachineshakeseriously.
I feel this machine vibration seriously.
459Themachinepartswenthot.
This machine parts fever.
460Thenoiseofthemachineisveryloud.
This machine is loud.
461Themachineisknockingbadly.
This machine rap.
462Iftherearisesanyabnormaltemperature(unusualnoises,vibration),itisnecessarytostopthemachineandinvestigatethecause.
If you have an abnormal temperature rise (abnormal noise, vibration), you must stop to identify the cause.
463Youmustturnofftheswitchwhenanythinggoeswrongwiththemotor.
If there is anything wrong with the motor, you must turn off the switch.
464WehaveplannedtofinishtheadjustmentofthemachinebeforeTuesday.
We should gradually increase the pressure of the compressor, and gradually put into full load operation.
465Therotationnumberofthemachineisontheincrease.
The machine turns on the rise.
466Afterafewhoursrunning,weshallcheckthemachine;andreplacetheoil,ifnecessary.
After a few hours of operation, we will check the machine; and, if necessary, change the oil.
467Weshallselectthesuitablegreaseinaccordancewiththelubricationchart.
We want to use under lubrication table to suitable grease.
468Whatisthetroublewiththemachine?
What is this machine?
469Ithinkthetroublelieshere. I think the fault here.
470Itisnecessarythatweshouldrepairitatonce.
We must fix it immediately.
471Weshallgivethemachineanothertrialat10o’clock.
We will be at the machine and try again.
472Themachinerunsperfectlywell,ithadbeenoperatingwithacontinuousrunof72hours.
This powerful machine is very good, it has been in continuous operation the 72 hours.
473Theresultofthetestrunsatisfiedus.
Test results and we are very satisfied.
474Itisnotdoubtfulthatthetestrunwillbesuccessful.
The test will succeed is out of question.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment