Saturday, January 29, 2011

【 Weak current College 】 introduction to Intelligent Office



In recent years, as the market for intelligent buildings rising, intelligent Office also received an unprecedented increase in the development, application, particularly in a professional Office. Intelligent Office has gradually penetrate into the way people work, in the use of high technology will not only give enterprises property protection, but also to employees of convenience.
Intelligent Office mainly include access control systems, intrusion control system, building automatic control system, Office management system for the four system.
As the Internet technology of high-speed development, intelligent networked Office system has become an inevitable trend. Gradually people can use the Internet to the Office equipment issued a directive requiring them to follow his request to complete the task (in offsite change users information/control remote access door, etc.) to reduce working time, provide operating efficiency.
The composition of the intelligent system Office
Office smart system using professional hardware operation in place of the ancient tradition of the door with a key, use the security doors, anti-theft network security, or to manually turn on the light, turn off the lights, heating and cooling of small things, such as cumbersome and out of the company's staff and strict management.
Access control system
With electronic key (can be a bank card or induction card) for all channels in the region to manage and control the door. All the time, employees are recorded in the system, you can through a computer or printer output results, convenient and accurate.
System features:
1. free to set the permissions of users of
Each card can only be used within the specified time and out of the specified channel.
2, double password "and" card + password "feature
For high security requirements, it requires users to not only read-only one card can open doors, but also two people at the same time card or card reader after password or password after card can open doors;
3. time period of control functions
Channel doors can at different times in different ways; as in the working time free access or use the card only after work and out of the need to use the card + password ";
4, passage door interlock function
You can use this feature effectively solve the problem of "follow-up", by setting up two road security doors, entry to security check space (door), the need to set this area closed (closed) to turn on another line of security doors;
5, when the system is a network failure, you can use reserve card control channel gate
6, passage door alarm function
When the channel door long or channel door open without lawful means, the system will immediately alert
Anti-theft system
Modern security system is the use of various electronic sensors replace the use of security doors, anti-theft network the whole office surrounded to the Office within a 24-hour monitoring of property. In the event of intrusion event system will issue a warning, or field of sounds, Flash, or notify the security officer for Security Center, or through 110 alarm, local police, or even directly inform the Office in charge of.
System features:
1. when a company has multiple, independent sector, each Department can independently open or close your Office area of anti-theft system; each zone is an independent alarm points, you can connect a variety of different types of electronic sensors;
2, when the zone alarm, you can set different alarm sound, to distinguish between the different alarm categories, such as fire, theft alarm, etc.;
3, the burglar detection point can set time limits for the pulse response times and to adjust its sensitivity, and reduce system of false alarm rate
4. automatic cloth disarmed features
When the system detects indoor in a State will automatically enter the deployment status; or enter a specific time period after the system can automatically deploys troops for defense or removed immediately;
5. access control linkage function
When users open the doors while automatically deploys troops for Defense (or disarmed) within its jurisdiction; Regional Office of the anti-theft system for intelligent control system
The system allows for Office lighting equipment, air-conditioning equipment, background music equipment for intelligent control.
System features:
· Light control: when no one in the region can automatically turn off when the room lighting, the contrary is on lighting.
· Air conditioning, ventilation control system based on temperature sensor receives the indoor temperature information automatically adjusts the indoor temperature and ventilation system.
· Background music control: System can automatically adjust background music playing time and region;
Intelligent management system Office
System features:
· The system can keep detailed records of all users access to the channel or Chief garrison anti-theft system;
· All employees access records can be automatically converted into attendance records instead of traditional punch clock register can clearly record each employee's attendance at the end of a date and time, can be automatically printed report, submitted to the Finance Department staff payroll calculation of a credentials;
The system can store employee photo information, when entering and leaving the door of a channel as a basis for comparison.

【 Weak current College 】 intelligent parking fieldbus CAN-bus network



Abstract: the life of convenience, making intelligent parking everywhere. This article describes how to use the fieldbus connection modernization CAN-bus smart parking each discrete Terminal, as well as the use of fieldbus CAN-bus networking after competitive advantage; and from a technical perspective, elaborated in the next few years the development trend of the intelligent car park.

1 foreword as society is changing lifestyle, science and technology of continue to progress, people require more user-friendly, intelligent living conditions. No hands-on, as much as possible to let the smart system instead of a manual way, for the effective management and implementation. The current traffic situation ever more complex, such as road and parking difficult issues reduced the city's work and life, efficiency obliges us to find an easy solution to the problem. Intelligent car park is in this background came into being. Intelligent parking generation not only standardized the urban traffic management and vehicle management, expanded the city's capacity, in security also has significant security, yet convenient and other intelligent systems interfaces (such as intelligent buildings, intelligent community, etc.) to form a more perfect logistics and equipment management system. 2 present situation at present smart parking communication intelligent of the parking lot, management also lack the ordering of commonality among the facilities are poor, leading system integrators and users of equipment selection varieties less, realization of insufficiency, system characteristics not sharp, etc. Press the smart car communication analysis, part of the early manufacturers use a serial RS-485 or RS-232 bus as a means of communication between the device; at the same time, some of the advanced manufacturers have adopted CAN-bus bus or an Ethernet network EtherNet as a means of communication.

By the way communications RS-232 parking system has great limitation, can only implement point-to-point operation, the burden on the central processor, not easy system expansion, communication distance is very short, not suitable for remote operations; and system costs are relatively high. Using RS-485 bus systems in the overall performance is better than RS-232 system, because it is easy to expand in the form of the bus, but as the parking system intelligence level increasingly demanding, features strong, bus nodes increasingly, RS-485 bus efficiency low, system of real-time performance difference, communication reliability, low maintenance cost is high, the late network project debugging complex, transmission distance is not ideal, single bus can hook application node, and so is not flexible enough and defect gradually manifested; intelligent parking system extensions are also affected by the restrictive RS-485 itself, and cannot accommodate large and medium-sized smart car park control needs. State-of-the-art communication systems of CAN-bus bus is intelligent parking of mainstream development direction. Use this kind of industrial-grade communication mode, you can ensure the reliability of data communications, real-time; and, the actual construction cost, CAN-bus bus and RS-485 way cost approximately equivalent, even in relatively large parking system, the overall cost of CAN bus also slightly lower than RS-485 system. Due to the can bus fault-tolerant performance is good, you can greatly reduce the latter part of the maintenance, repair and expansion costs. However, most of the smart car adopts CAN-bus bus and RS-232, RS-485 communications mix, to a certain extent may cause network load imbalance limits CAN-bus bus play maximum performance advantages. The following will be formed by CAN-bus bus parking fees and management system, for example, describes a set of intelligent car park improvement programmes, thereby reflecting the overall advantages CAN-bus bus. 3 intelligent parking CAN-bus programme 3.1 CAN-bus introduction CAN (Controller Area Network) bus was made by Germany BOSCH company, mainly used for automotive internal measurement and control of the data communication between the centers. Because of its good performance in the world is widely used in other areas, such as industrial automation, automotive, building construction, Elevator network, electricity distribution and security fire and many other fields, and gradually become the main means of communication.

Fieldbus CAN-bus characteristics: 1, the international standard industrial field bus, transport, reliable, real-time high; 2, transmission distance (farthest 10KM), transfer rates (up to 1Mbps); 3, single bus maximum 110 nodes and can easily expand the number of nodes; 4, bus on each node of the status of equality, non-slave, unexpected data can be transmitted in real time; 5, non-destructive bus arbitration techniques that many nodes in parallel to the bus data bus utilization high; 6, error CAN node automatically shut down and cut off and bus links, and does not affect bus communication; 7, the message is short frame structure and a hardware CRC, interference data probability is small, extremely low error rate; 8, was not successfully sent messages are automatically sent, hardware features, transmission reliability is very high; 9, a hardware address filtering features that simplify software development agreements; 10, communication media available ordinary twisted pair and coaxial or optical etc; 11, CAN-bus bus system structure is simple, the cost performance is extremely high. Introduction to communication programme in General 3.2 covered car park of almost all control features, including export and import control, remote control, yard orientation, yard parking auto detection, intelligent lighting control the shaft. Programme does not include the transmission of audio, video, audio, video of the transmission is generally separate from the control bus. The entire system, communication backbone of only one twisted pair, various communication terminal controller directly connected to the bus; and, various controllers in the network status can be equal, so there is no "host" and "the concept of" from the machine, any node can start data transfer, to avoid the use of host polling mode RS-485, thus protecting the numberIt is in real-time. In CAN-bus bus, either as point-point communication or multicast mode of communication, real-time performance and flexibility can be good. For example, you can according to car parking space probes inside the car of a direct transfer into and out of the change, the number of parking spaces to monitor displayed; without having to transfer to the management machine, which will manage machine to parking monitor. Course management machine also can receive the information for the database records.

Intelligent Car Park communication distance from CAN-bus bus baud rate restriction; 20Kbps communication speed, you can achieve communication distance 3KM (use the same twisted pair) that meets most needs. In this scenario, follow the location of the parking system is divided into two parts: the vehicles of import and export controls, internal control shaft. Export and import control vehicle 3.3 vehicles and export control section of the main function is to access management, charges, tickets and shows, etc. System cabling structure as shown in Figure 1. System with linear CAN-bus network topology, device nodes connected by extension CAN-bus mainline. In the yard entrance, local sense detects vehicles pass, entry controller to send a signal to the computer management node, start the whole request management system (prior to this system is in hibernation to save energy), the system immediately into work mode. Entrance to the controller through the radio frequency or GPRS mode read vehicle electronic card information, and through CAN-bus bus transfer to the management computer and the camera's vehicle information (cars, car, etc.) in contrast, if this is the "legal" user opens gates, light green traffic lights to allow vehicles to pass. When the Barrier Gate Office to sense detection vehicles have passed, and the entrance to sense does not detect the new vehicles will still be imported controller to the computer management node report system idle, you can enter a sleep mode. Other features, such as export controls, features, etc, all charges can be managed in the same way. System, the management node used to install Universal PC-CAN interface card, the PC and perform different functions, install a different location of terminal equipment. Commonly used PC-CAN interface card: PCI-CAN interface card, ISA-CAN interface card, USBCAN interface card, PC104-CAN interface card, EtherNet-CAN interface cards or parallel port CAN interface cards may be based on the system of communication requirements for a reasonable choice. 3.4 yard yard internal control within the control of some of the major feature is the space vehicle guidance, testing, and lighting control. As shown in Figure 2, figure in the yard is divided into four parking areas: A, B, c and D zones. 4 districts locational boot system housed in the yard entrance indicating regional orientation and the current remaining empty digits. The location of the boot system consists of a controller with a CAN-bus bus interface. When a vehicle or vehicle owners and a related area, the area of lighting is lit, the departure of the vehicle or vehicle owners, lights automatically turns off and is not related to the current access zone lighting will not be lit so that you can maximize the energy conservation, to extend equipment life, this is a large parking lot in effect will be more prominent. In access, car parking number changes, the system can be timely detected the changes and to the main controller and location guide signs report to refresh the current record and display. Such a system, using CAN-bus bus communication, the network is very simple, reliable, as shown in Figure 2. Each parking area there is a separate zone controller, with CAN-bus interface for management of lighting and parking area. As shown in the figure, the red line is a line, through the zone controller for direct control of the light will light off. The green line is a single bus, and communication, and detector(UD) CAN-bus bus, forming a convenient secondary data communication network. Of course, detector(UD) network set up you can also use CAN-bus manner, basically not be affected by the restriction of the number of parking spaces, and you can easily implement device management, fault location and many other specific functions. 4 system advantages of these two parts are connected, you can form a complete intelligent parking system. The entire system, not only can you achieve unattended, and other CAN-bus system connections, such as wuyeguanlizhongxin, community centers, convenience of operation and management of the overall system. Use CAN-bus bus, as well as custom communication protocols, design software offers very significant advantages, so that the system's overall performance is improved. At the same time, using CAN-bus bus can greatly reduce the entire Smart car park in the device extension, system upgrades, terminal maintenance costs of the inputs. Also, the more large-scale intelligent parking system, the advantages of using CAN-bus bus will be more obvious – features a good, low cost, management and maintenance cost savings. Practice has proved that adopts CAN-bus bus in smart car running can obtain good social and economic interests. CAN-bus bus has been successfully operating in the country more intelligent parking, yard equipment, vehicle management, vehicle toll stations, etc. This is the domestic multitudinous traffic control network for reliable, automated, unattended operation, direction of development.

【 Weak current College 】 property services based service standards


Security services based on service standards
1 scope
This standard defines the security service goals and basic requirements, door posts, inspection, monitoring, vehicle management service request.
This standard applies to property management limited management zone of security services, does not apply to ordinary housing management area.
2 goals
The unit provides security, Shu to living environment.
3. basic requirements
3.1 security personnel should follow the company provides unified clothing, wear a name badge, the appropriate modifications, of a dignified instrument appearance tidy, pre-joining should wear a well-equipped, energetic.
3.2 value posts and unit, visitors should use civilized conversation, specification language, you should not use the "command", "required" terminological and taboos.
3.3 and need help (such as switch door, lift weights, young and old alike, booking taxis, etc), should take the initiative to provide services in a timely manner.
3.4 produce unexpected events should be all kinds of emergency plan to respond quickly, decisively make appropriate disposal, instant reports superior, and record.
4 door post service
4.1 management area for 24 hours a day, and post security services.
4.2 management area doors 05: 00-24: 00 the open service; 00:-05: 00 next day-closed, vehicular, shift security guard shall promptly provide the opening, closing services.
4.3 no scavengers, small vendors, sales people to enter the administrative area.
4.4 rainy days as unit provides convenient umbrella (only in residential property management area implemented) or protective sleeve (only in the Office building management area), and other public service.
Access management regional 4.5 on motor vehicles the pass system, registration and parking fees (fee schedule provided by the seat of the price). Prohibition contained flammable, explosive, toxic, harmful and other polluting goods vehicles into the management area.
4.6 block 4 tons and over large vehicles into the management area (special vehicle and transportation vehicles).
5 visiting post service
5.1 management area within 365 days 24 hours security patrol service.
5.2 burglar, fire prevention, disaster prevention and maintenance management area of public order, press the set visit route, ensure that each hour visited and all public areas.
5.3 in management area suppression occupy public places any construction behavior.
5.4 ensure that night (18: 00-08: 00 the next day) and national holidays are not issued to influence others rest of decoration, construction noise.
5.5 response to unexpected events, should develop appropriate emergency plan and exercises regularly (every 1-2 years).
6 monitoring post Service (only in the management of a monitoring centre region)
6.1 management area monitoring system opened 24 hours a day, and run special monitoring duty service, Sentinel surveillance video, tracking and monitoring of suspicious circumstances and synchronous video.
6.2 monitoring video data saved for a month, a video loop.
7 vehicle management services
7.1 road traffic management services
7.1.1 community trunk floor with white paint to draw traffic signs indicating directions; the road bends and gate guard erected traffic ban, as shown below, Ming, speed limit signs, such as to ensure the smooth flow of road traffic and safety.
7.1.2 carriageways on either side of the stone with yellow paint marks, indicating that no parking; black and white paint (spacing 30cm) flag, to allow temporary parking to ensure that management has no parking in the region.
7.1.3 path allows parking location, with white paint marks, number.
7.1.4 on into the management area of special vehicle should be guided, and commanding vehicle parking spaces in parking as required.
7.2 parking management services
7.2.1 in the parking ground with white paint to draw traffic guidance signs and parking signs.
7.2.2 in parking stand out above the import and export, hanging signs, high limit the ban.
7.2.3 parking ventilation, fire control, drainage and lighting equipment, facilities should be kept in good order.
7.2.4 maintain garage environment clean and tidy, no leakage, ground flat, no stagnant water.
7.3 vehicle management services
7.3.1 motor vehicles
7.3.1.1 to completed long-term parking permit unit provides relatively fixed parking spaces.
7.3.1.2 underground garage only for unit providing long term parking service (special circumstances require temporary parking should be approved by the Administrative Office Manager stop).
7.3.1.3 assisted and guided vehicle security parking, remind owners keep valuables left in the car, don't forget to close the window and door. Check the condition of vehicles, such as the discovery of oil spills, damaged, the owner should be immediately prompted to management reports.
7.3.1.4 community ground specified region may provide temporary parking services, but do limit certification system, a first-come-first-stop, full, and to ensure that the parking of vehicles is important.
7.3.2 non-motor vehicles
7.3.2.1 for people management in non-motorized vehicles provide specified range ordered parking services.
7.3.2.2 on charges of non-motor library implemented access-licensing system (fees according to the location of the price regulations).
Cleaning service Foundation service standards
1 scope
This standard sets out the basic requirements to maintain cleanliness the service and indoor, peripheral areas, external specialized cleaning service requirements.
This standard applies to Shanghai Lu jiazui management limited management zone of the cleaning service, does not apply to ordinary housing management area.
2 reference files of the Shanghai building cleaning and maintenance of quality standards (for trial implementation) "Hu-capacity environment City (2001), no. 065.
3 basic requirements
3.1 cleaners should follow the provisions unity clothing company, wear a name badge, grooming and dignified.
3.2 unit, visitors to provide a clean, comfortable and hygienic self-taught, work environment.
3.3 the standardized operation, scientific management.
3.4 timely, timely, and timely implementation of the cleaning service.
3.5 take care of the property's facilities and property.
3.6 timely processing of waste, according to the specified locations and categories installed waste.
3.7 economize on water, electricity.
3.8 comply with safety regulations and procedures.
3.9 job does not allow the use of the material causing damage to the building materials and cleaning agents, note maintenance building.
3.10 civilization, orderly operations, minimize on the surrounding environment and living and working.
4 indoor cleaning services
4.1 ground
4.1.1 basic quality requirements: surfaces, joints, corners, edges, and other Office cleaning, sundries, dust, dirt, stains and marks, scratches, etc.
4.1.2 category quality requirements, different surface materials for cleaning quality requirements, as shown in the table below. Table 1 floor cleaning classification quality requirements 4.2 wall
4.2.1 basic quality requirements
Surface, seams, top corners, edges, etc should be clean, free of dust, dirt, stains and marks, scratches, etc.
4.2.2 classification quality requirements
Different wall materials for cleaning quality requirements, as shown in table 2.
4.3
Doors, Windows
4.3.1 window, door, window frames, Windows sets and upper of the slit, the glass and door frame corners of the Medicine Department, hinged, in-Office of the revolving door parts, should be free of dust, dirt, grime, Western blot, etc.
4.3.2 door frame bottom should be no dust.
4.3.3 door, window glass according to the requirements of 4.2.2.
4.3.4 metal doors, frames, doors, window frames, Windows sets, handrails, handle, and so should no oxidation spots, shiny, and keep it metal texture.
Table 2 wall cleaning classification quality requirements \ 4.4 elevator
Material quality requirements
Granite, marble, the surface is smooth, bright
Wallpaper no dust, mould point, color uniformity
Paint the black scratches and other dirt
Sheathing smooth surface, color uniformity
Glass, mirror-like surface clean and bright, the spot is good, clear mirror portrait
Matte silk sheath of stainless steel, brass and other surface clean uniform, bright, scratches, imprinting, metallic
Polished mirror stainless steel, brass and other surface luster homogeneous, bright as a mirror, scratches, imprinting
Aluminum sheet surface is smooth, seams kept clean
Tile surface is smooth, color uniformity, point, line and plane line winding
Color steel and other metal facings color uniformity
4.4.1 vertical long falling passenger elevator
4.4.1.1 cabin floor under 4.4.1.
4.4.1.2 elevator door by 4.3.
4.4.2 escalators, automatic sidewalk.
4.4.2.1 steps, ladders should be kept clean, bright, no dust, dirt, stains, etc.
4.4.2.2 rubber handrail should maintain a uniform colour without the dirt and grime.
4.4.2.3 off press 4.2.
4.4.2.4 shell, side template should be kept clean, bright, color uniformity, without dust, dirt, etc.., mark
4.4.3 the freight elevator can reference 4.4.1 requirements.
4.5 toilet
4.5.1 the bathroom should be no smell, the smell.
4.5.2 ground by 4.1.
4.5.3 wall slab, toilet partitions, toilet partitions, doors by 4.2.
4.5.4 sanitary ware internal, surface and the following should be no dust, imprinting, the unusual smell.
4.5.5 makeup mirror surface clean and bright, the spot is good, mirror-like clarity.
4.5.6 bathroom door, the door set by 4.3.
4.5.7 bathroom toilet paper holder, stem cell phones, shade surface should be free of dust, imprinted and keep clean.
4.6 fire channel
4.6.1 bench, walls, ceilings, exposed facility pipes should be no dust, dirt and grime.
4.6.2 stairs, platforms should be free of dust, dirt, grime, decorative brick bright color should be.
4.6.3 handrail, railing and bottom, the roots should be no dust, dirt and grime.
4.6.4 channel door, door, glass, frame press 4.3 provides.
4.6.5 light, shade, fire alarm box should no dust and dirt.
4.7 pantry
4.7.1 wall press 4.2.
4.7.2 water furnace shell should no stains, no trace.
4.7.3 playing water platform floor no watermark, smudged, product channels sundries, scale.
4.7.4 bucket should no stains, dirt, enamel surface should be shiny, no scratches; water supply should be smooth, overflow, sewer entrance should be no smell.
4.7.5 frame press 4.3.
4.8 smoking room
4.8.1 keep indoor air circulation.
4.8.2 ground by 4.1.
4.8.3 seat and the seat of the connection point shall be free of dust, debris and dirt.
4.8.4 the combination of surface and the floor, corner free of dust, dirt, grime, Western blot, etc.
4.8.5 ashtray shell should no dust, water, dirt; the cigarette ashtray should not exceed five.
4.8.6 water left in the sputum Meng should be clean, no debris; phlegm out should be no dust and Bangladesh, water and dirt.
4.8.7 frame press 4.3.
4.9 basements, underground garage
4.9.1 ground by 4.1.
4.9.2 various facilities, lighting should be kept clean, clean, dust, stains.
4.10 furniture and interior furnishings
4.10.1 the combining surface and furniture, the corner without dust, imprinting, dirt, stains, furniture glass, mirror-like surface clean and bright, spot is good, mirror-like clarity.
4.10.2 metal handrail, handle, decoration and so on should be no oxidation spots, shiny, and keep the metal texture.
4.10.3 phone surface should be free of dust, stains, the receiver should be disinfected on a regular basis without the smell, the telephone line should be collated.
4.10.4 indoor gardening pots should be no debris, afforestation should no dust.
4.10.5 lighting accessories, artificial plants, metal facing should be kept clean and free of dust, dirt, water, rust, imprinting.
4.11 other facilities
4.11.1 fire facilities, fire extinguishing system, fire box, the alarm button appearance should remain red sharp, no dust, dirt, dust-free inside.
4.11.2 probe (video surveillance) shell without dust, dirt and water.
4.11.3 various signs and indicators should remain distinct, brand stand out, displays and signage surface should be free of dust, dirt, imprinting.
4.11.4 bins should be disinfected on a regular basis, not overflowing, appearance without fouling, dirt, water.
4.11.5 inlet and outlet should be kept clean and free of dust and dirt.
4.11.6 grid and ceiling should be kept clean and surface luster evenly, no ash, pendant hangs.
5 external sites maintain service
5.1 channel, sidewalk kept clean and free of dust, water, dirt, debris and dirt, the road surface and wheels India should be maintained.
5.2 waste containers should be disinfected on a regular basis, not overflowing, appearance without fouling, dirt, water, placing points around clean, no waste water, no smell and odor.
5.3 green, flower bed, isolation, band, there should be no trees surrounding debris, paper scraps, dirt, etc.
5.4 pool pool remain transparent, no floating in the water, sediment, no Moss, the unusual smell.
5.5 sculpture should be free of dirt, stains, dust, etc.
5.6 billboards, signs, lighting, railing, mirrors and other surface should be free of dust, dirt, stains, stone surfaces, metal surfaces, glass surface should be colour bright, no scratches.
5.7 buildings and exporters bench, hallway floor according to the provisions of 4.1.1. base outside the walls, columns should be shiny and free of dirt and grime. In the following part No dust 2m, dirt; lateral glass and window sill, window frames according to 4.3.1.
5.8 step rugs should be kept dry, no water, dirt and stains.
6 exterior cleaning service
6.1 wall should be kept clean and free of dust, cleaning should be no difference, changing color.
6.2 exterior category cleaning quality requirement is consistent with the requirements of the table.
7 specialized cleaning service
7.1 waxes
7.1.1 surface wax should be uniform coverage, no leaks hit points and bubble exists.
7.1.2 sealing wax, surface the thickness of each layer of wax, shall not be lower than 0.5mm.
7.2 carpet cleaning
7.2.1 natural fiber rugs should be dry or half-dry cleaning (synthetic carpet cleaning methods not limit).
7.2.2 chosen detergents should minimize the damage to the carpet fibers.
7.2.3 after cleaning, carpet should not shrink, fade, distortion, breakage, stains, venom, residues.
7.2.4 after cleaning, carpet cleaning, fiber orientation should be consistent, uniform color.
7.3 sofa cleaning
7.3.1 cleaning, sofa should not shrink, fade, distortion, breakage, stains, bad point, residues.
7.3.2 cleaning, sofa should be clean, color uniformity, no color difference.

【 Weak current College 】 guard fire rescue notes


"Taishan" fire danger is command. While Agni in side burns, security guards comrades you are prepared to save lives.

Fire rescue, very dangerous, and requires courage and loyalty to the security and proper manner.

A, attention: (1) avoid injuries; (2) the rapid action.

B, keep in mind: (1) to save before you alarm, fire phone "119" reported clearly resides, the location of the name, the extent of the fire.

(2) if the fire burns or House will collapse, not entering.

(3) filled with smoke, fire, should be carefully into the inner wear appropriate respiratory equipment (mask) and the corresponding self-rescue devices.

(4) into the fire before the rope tied to the waist at the other end who hold outside, in the event of lost, by the rope on the way out of the fire. Even if the flue choke with Halo, outside people or you can drag out of myself.

(5) water pouring wet clothes or put on the fire fighting clothing (85-94) or wet handkerchief mouth, nose, resist smoke.

(6) if there is a blanket or a coat, a water soaks through the shoulders.

(7) enter the scene, each on a door; first with the back of the touch touch door handle, if hot carefully.

(8) if the door to hot, the door should take to avoid the hot air in the room pull open the door. If the door is open to the outside of the application, so as to avoid foot withstand door suddenly pops open.

(9) take a deep breath, opened the door half, bulk out hot air, and then enter.

(10) into the smoke great room, body should lie on the line or belly.

(11) found injured persons, should promptly towed from the scene, note, out of danger to rescue, note faster.

【 Weak current College 】 family decoration management essentials


1. project material 1) works mainly with material selection based on design requirements to meet the national standards of product quality level. 2) fine wood wood species, material level, consistent with the wood frame construction and acceptance regulations (GBJ206-83). Wood moisture content of 12%, sheet ≤ moisture ¡ü 10% of the wood without decay, insects, dead Festival, cracks and other defects. 3) electrical products comply with the relevant State regulations, Terminal products are qualified products. 4) customer purchases goods from the customer to control quality. Second, the structure of security 1) decoration must guarantee housing the integrity of the original main structure, antiknock characteristics, security, should be consistent with and meet the urban planning, fire services, sanitation, electricity, water supply, gas supply, and other aspects of the provisions shall not affect the adjoining room decoration. The main structure of acceptance is not eligible for housing or building, temporary buildings, serious damage has not been reinforced housing home decoration shall be carried out. 2) owners or users of the home decoration, no damage to the building alters and, that is the subject of load-bearing walls, beams, columns, plate, pour concrete main wall, etc. Prohibited in load-bearing walls, seismic wall broken wall openings, shall any expansion door window area, destroyed window walls or wall between Windows. 3) shall not be arbitrarily increased floors above ground must not be arbitrary static loading, mark, without the roof drilling through tube direct embedding or changed lines; shall not undermine the kitchen, toilets and ground water, water, heating, electricity, gas facilities, extensive use of inflammable, explosive materials, etc. 4) decoration, cantilever balcony is strictly forbidden to change the structure of the force. Shall not be arbitrarily increased balcony surface fill material. 5) water supply, drainage vertical tube, floor drain, where the pit should be changed. Gas pipeline from the part after the gas meter shall be carried out in a sealed packet processing. 6) decoration, heating engineering, gas engineering aspects, should contact holding the engineering work permit for the construction of specialized units. III. family decoration construction program 1. construction construction units before the urge to the construction of infrastructure quality checks, understand the material and rubbish dumps of transport channels and locations. 2. removal of venue after the first, primary processing, and hydropower project, basic finishes other processes. 3. indoor general order 1) General room: ceiling → wooden basis → wall surface processing → thin wooden decoration → re-surfacing → paint → electrical installation → coating → hardware setup → ending 2) kitchen and toilet: Masonry Waterproofing screed → → → → suspended ceiling tiles tiles (or coating) → thin wood products → paint finishes → kitchen ware electrical installation → ending 3) above is the normal repair construction of general procedures specific to each project which required appropriate adjustment process to achieve the best construction effects. 4. inspection tools and methods 1. test tool: ruler, tape measure, level tape, on foot, feeler gauge, wire rope, angle square, according to the different construction projects require different tools. 2. the inspection methods: inspection methods are primarily tools for testing and human capabilities (such as tactile, Visual, etc.) a combination of methods.
Decoration of the ceiling, ceiling works generally uses wood joist, light steel keel, as the main joist materials, gypsum board, plywood, calcium mineral wool panels, plastic plates, glass, PVC plates, aluminum plates, decorative materials. Second, surface engineering including the surface engineering, ground floor stone, floor tiles, carpets, and other types of decoration, as well as on the surface of the water treatment. III. the wall surface engineering wall works mainly refers to the interior paint works, wallpaper, wall hanging, wall tile, wall stones, and other projects. 4. fine wood products engineering in general household decoration which transparent finishing products use lumbercore plywood or wood joist exterior veneer sanheban technology; opaque finishing products use lumbercore plywood exterior General Sanheban or density Board production; there are also three melamine impregnated paper, plywood, particle board (medium density, particle board) exterior fire Board, and other production processes. V. Paint project 1. Clear oil finishes: i.e. timber color transparent finishing. 2. mixing finishing: i.e. opaque finishing. 6. hydropower project construction party is only allowed on indoor total distribution box (not including) within the circuit and total water meter (not including) within the pipeline construction. Other parts should contact property for renovation. Seven, lamps, sanitary ware, kitchen utensils, hardware installation

【 Weak current College 】 intelligent lighting control system


Lighting design in home decoration has been growing in occupies a very important position. Home lighting design, lighting and light source selection is very important, in accordance with the light in the lamps and home illumination is adjustable into dimmable lights and not dimmable lamp, dimming the lamp pendant lamp is normally, downlight, wall lamps, floor lamps, table lamps, embedded lamp, outdoor iron landscape lights, etc., usually the built-in light source is white Poncirus bulb or voltage adjustable in other types of bulbs. Not dimmable lamp usually light is ceiling lamps, Ceiling lamps, ceiling embedded glow lights films, ceiling spotlight and Suspender spotlight, track lights, lamps, tail lamp, lawn lamp, usually the built-in light source is energy-saving lamps, fluorescent tubes, low-voltage lamps, etc.
So, the lighting design and smart home what is closely associated with? we first look at Jimmy's galloping smart home lighting control system of basic concepts. Jimmy relaxation intelligent lighting control module is the "five key switch," and each "five key switch" can control two road lighting, road lighting in accordance with the light source is adjustable partition out the "five key switch" in two ways. One is the way the way dimming, no dimming, one is a two way not dimming. For example: in a living room of lighting design with six road lighting are the main pendant, ceiling downlight, light tank lamp, wall lights, open balcony ceiling, built-in floor lamp bulb sofa. Follow the light illumination is adjustable, can be seen in a built-in lamp downlight main pendant lamp, ceiling, floor lamp, sofa three lights are dimmable lamp, light tank lamp, wall lights, open balcony ceiling lamps, such as the three lights are not dimmable lights. In this connection we can follow a kinds is way way dimming, no dimming output distribution methods, adjustable light and not adjustable light a match from a three to five key switch "to control. Then, for example, in a bathroom there are energy-saving ceiling lamp and extractor fan, so we can follow two routes are not dimming output distribution methods to determine a "five key switch".
"Five key switch" features
1. the five key switch "is relaxation of the main components of intelligent home, it has two output circuit, you can add two sets of lights, a group can be a single switch, can also be used for dimming, another group can only be a single switch. Rated output power (dimmable): 300W, rated output power (switch): 1200W. Generally speaking, each of the five key switch can control two road lights or low power electrical appliances.
2. the "five key switch" is a CR-Bus bus compatible programmable devices. By CR-Bus bus compatible remote control, remote control, telephone, remote control, as well as Internet control.
3. the "five key switch" has five input buttons, through programming that can be used for lighting control and remote switching, dimming and lighting scene control, electric curtains, you can also control CR-Bus other devices on the bus (socket, electrical appliances, etc.).
4. dimming output has the fade function. Settable 0 ~ 250s of fade time lighting brightness 0-100% free set, light fading out the Dim.

The family of decorative lighting through the realization of intelligent systems for Jimmy relaxation garden landscape lighting modes, urinate light mode, vestibule welcoming lighting model, family home to light mode, home theater lighting model, family warm coffee light mode, family common lighting model, family dinner, light mode, cheat mode thieves lighting, comfortable lighting in human nature.

Function for example:
· Automatic lighting display — set Dim time band (e.g. night 19: 00-6: 00 before), inside the vestibule and corridor lighting can implement "people come to light, people go the lights". When a person enters the vestibule spotless, then, whether into the home or away from home, the area light will gradually lightened, let you adapt to the changes of the light. Its final brightness can be freely set in 256 levels, while the lights can be set from 0-255 seconds after any one time.
· Lighting total management – leave home, pressing the away mode, the system can also automatically close your home all the lighting, regardless of your family, you do not need to check the upstairs and downstairs which lamp is not turned off.
· Master bedroom, and children's room to urinate light mode — master the night to urinate, foot drop, the program set up by the need to urinate all along the light automatically light up, go back to bed after use of bedside switch pressed a key, you can turn off all the lights. To urinate light mode, set the lighting in General 8S seconds by the dark progressive reaches 50% of the brightness to make people dream woke up gradually to adapt to the light intensity.
· First floor rooms to urinate lighting to ensure guests to urinate when pressing the bedside switch a key you can make the light along with set program all turned on, go back to bed, a bedside switch pressed keys set program off all the lights along the way.
· Bathroom, the kitchen exhaust fan within the set time, automatic ventilation and at set time automatically shut down, thereby maintaining clean air.
· Setting the floor any few road lighting at set time automatically light up some time, and at set time automatically close to imitate someone spoofing rogues in the House.
· Remote light control — when you go home in the evening, you can call remote open and close family spoof thief light.
· Set security was triggered since the bright lights after to frighten the thieves — your home security deployment, if someone invades your window, before he crossed over to the Windows Home suddenly sound alarm and automatic opening of light will let "the visitor" wanted.
· Strengthening the topic wall light mode using irradiation downlight fade capabilities to flavor intensive topic wall.
· Enter the vestibule to the road, the entire open area on the downlight lighting ceilings in accordance with the different row, different columns, different locations can set different fade time and different brightness, eventually forming a wave effect.
· Family shadowHome lighting mode, the living room sofa table lamps, ceiling as you can on the downlight will shoot 20% very weak brightness to match the specific requirements of brightness.
· All intelligent lighting use presentation program, you can shape the family garden landscape lighting modes, urinate light mode, vestibule welcoming lighting model, family home to light mode, home theater lighting model, family warm coffee light mode, family common lighting model, family dinner, light mode, cheat mode thieves lighting, comfortable lighting in human nature. Above the brightness of light can design different variations of light combinations.

Of which, lighting output fade functionality usually can play a significant role, for example:
· Night, people from outside into the vestibule moment and trigger light automatically light up when setting the lights will set the time by off gradually reaches 100%, or other settings of brightness, so that people gradually adapted to the light intensity.
· In the vestibule welcoming lighting mode vestibule topic wall downlight of fade feature can enhance topic wall.
· Enter the vestibule to the road, the ceiling of the downlight arrangement in accordance with different, different columns, different locations can set different fade time and different brightness, eventually forming a light wave time effect.
· Home Theater lighting mode, the living room sofa table lamps, ceiling on downlight, etc. can set 20% very weak brightness, fitness for a particular scene of lighting needs.
· Family warm and have a light, family dinner, lighting, home lighting mode is used, you can specify different lamps in different States, the light can also change the design of the lighting brightness of different combinations.
· To urinate light mode, people urinate lamp lit or automatically into the bathroom to urinate, lights automatically light up when setting the lights in the 8S seconds by off gradually reached 50% or more of the brightness, so that people in a State of sleep belongs to gradually adapt to light intensity.

Control mode:
· Per lighting can directly through five key switch direct control
· You can remote control a remote control in hand, all the lights in the direction of the voluntary control of no
· Host control
· Remote phone control
· Various lighting combination mode you can open a key on the remote control or conversion. You can also direct control of the five key switch

【 Weak current College 】 electrical, electronic and fire fire alarm installation project overseeing Regulation (2)


5. on the installation of the operating procedures and methods of supervision

1. substation equipment installation
(1) comply with the following construction process:
Equipment shipped to site and installation of machines and tools for ontology and accessories for apparatus for checking installation grounding (zero) in the laying of electrical test extension ontology seal check pilot;
(2) equipment at the scene supervision should be made with the owner, contractor: following acceptance check
① equipment type specifications must conform to the design requirements, accessories, spare parts and complete;
② factory of technical papers should complete well-found;
③ Press the electric equipment installation engineering and construction acceptance of law for Visual inspection.
(3) high-voltage switch cabinet, power distribution box, equipment, technical information, quality assurance and product certification must complete, the device remains intact, annex, accessories complete.
(4) the Cabinet base channel installation is complete, the strict implementation of the electrical equipment installation engineering construction and acceptance of GBJ50171-92, particularly high or low cabinet base channel installation level error shall not exceed 5/1000, reliable grounding. Cabinet and the Cabinet between bolt connections, the top level row counter is less than 5 mm deviation, disc surface perpendicularity of less than 5 mm;
(5) basic track should level transformer, gauge and the track gauge should fit and equipped with a gas relay transformer should make its top cover along the flow direction of gas relay 1-1.5% rise slope (factory shall not be required unless the gradient). Equipped with a scroll wheel in the wheel rotating flexible transformer, the transformer in place will be demolished wheel brake system be fixed;
(6) transformer on the runtime checks for the following provisions:
① neutral grounding system of transformers in shock during closing one of grounded in good condition;
② transformer first input voltage switch-on, when you full (if conditions are starting from zero pressure), closing the input voltage;
③ first electricity after 10 minutes duration, there is no anomaly observed transformer.
(7) quality standards and test methods:
Quality standards and test methods of observing the 10kV substation construction acceptance ".
(8) Note supervision and construction units to overcome the following common problems:
① box with holes is not accurate, using electricity, gas welding-cutting holes and electric pipe diameter size does not meet the requirements;
② Cabinet and Cabinet gap between the high side, the underlying channel embedded biased, school usually not carefully.
(9) provide the following verification data:
① voltage test records and the insulation resistance values;
② low voltage electrical adjustment, setting records in the table;
③ product certification and factory test records;
④ construction electrical substation shizi Division Engineering sub-item project qualitative assessment table installed.
2. cabling and cable bridges.
(1), the part of the process of construction in compliance with the following construction:
Product quality check on line positioning trenching cabling, sand, cover brick backfill do Terminal wiring of electrical performance testing;
(2), the cable laying is strictly a stranded twist, armored flattening, sheath faults and surface defects such as severe scratches, buried cable is forbidden in the pipe above and below the parallel laying. Cable laying of coordinates and elevation is correct, neat and tidy, flag clear towards the right, anti-burning, heat insulation and anticorrosion protection measures complete required;
(3) in the laying of cables on the bracket, the order fixed reliable, correct, control cable in the power cable, cable turning and branch office not disorder, to tidy that flag is clear, buried cable of concealed work record and coordinate graph is complete and accurate;
(4) the Cable Tray Installation fixed using bolt, nut firmly towards the outer join is not loose, stop using the electrical or gas welding and cutting of the cable tray accessories, hanger, branch, Bay and embedded parts fixed use of electric welding welding, cutting and welding parts should brush color anticorrosion paint and rust primer;
(5) tube thread should be in the building of plastering and surface engineering conduct after the end of the thread before the canal water and debris clean-clean, lead in tubes without joints and kink, pipe mouth place to install protective wire retainer;
(6) provide the following verification data:
① product specifications, certification, testing and installation instructions and other documents;
② installation works and subtle technical documentation.
3. apparatus and distribution box installation:
(1) comply with the following construction process:
Apparatus, power distribution box approach, the installation of machines and tools for lamps, switches, installation switchboards installation wires and insulation resistance test apparatus connected power commissioning;
(2) distribution box installation location is correct, the part is complete, the appropriate box, cut a hole, multiple tube box neatly arranged in neat, tube, pipe and tank fastening, crimp reliable, power distribution Cabinet close to the wall, the zero line by bus (zero Terminal), connect a clear ranking, no splicing phenomenon;
(3) conductors and apparatus firmly close, not hurt the core wire, wire connections without loosing compressing, bolted on the same terminal when the conductor is not more than two, washers accessories are complete;
(4) switch to cut off the line, Edison lampholders phase line should add contacts and the Terminal in the Centre. Three-phase socket wiring phase sequence arrangement consistent with receptacle left zero right fire wire, single-phase three holes, three-phase four-hole socket directly above the Earth wire connected. Outlet is not grounded individual route and ground zero line mix business with pleasure, with yellow and white-color line;
(5) the branch circuit insulation resistance test qualified before the lamp test, the insulation resistance is generally not less than 0.5 m Ω;
(6) quality standard and acceptance methods comply with:
Install the construction electrical engineering construction quality approval standard "GB50303-2002
The architectural engineering construction quality approval unification standard GB50300-2001
(7) to supervise the construction units to overcome the following common problems:
Distribution box, the installation does not meet the requirements: box body not just from the ground an inconsistent, grounding position chaos received, the branch line and head out now, no circuit number box and external pollutionDyeing;
(8) verification of the information provided is as follows:
① manufacturers provide product manual, product test reports and certificates;
② concealed work records table;
③ apparatus and distribution boxes, and other installation record datasheet and sub-item project quality approval sheet.
4. low-voltage electrical installations.
(1) comply with the following construction process:
Low pressure electric appliance approach, installation and test equipment for low-voltage electrical appliances installed before checking installed electrical actuator installation electrical grounding wire welding (zero) in the laying of electrical insulation measurement extension resistance test engineering acceptance;
(2) electrical devices and equipment arrives, supervision engineer and the owner, contractor acceptance inspection for the following:
① electrical specifications should meet the design requirements, annex complete spare parts;
② electrical product technical documentation is complete;
③ Press the electric equipment installation engineering construction and acceptance of the relevant provisions for Visual inspection.
(3) low-voltage electrical installation, construction project should meet the following conditions:
① demolition on the electrical installation is prevented by the template, scaffolding, etc., the venue clean;
② indoor floor base construction has been completed, and mark the wall plastering elevation;
③ equipments Foundation and framework to allow installation of strength, the mechanical strength of welded components meet design requirements;
④ embedded parts, reserved hole location and size to fit the design requirements, embedded parts solid and reliable.
(4) electric external wiring should meet the following requirements:
① Press the electric wiring connection end flag;
② in General, the power supply side wire should be connected in line-end (fixed contact terminals), load side wires should be received at the outlet end (movable contact terminals).
(5) low-voltage electrical insulation resistance measurement should satisfy the following requirements:
① measuring site; contact the disconnect location, with very spacious and outlet side; contact in the closed position, very different parts of the belt; the potential live parts and metal shell;
② to measure insulation resistance using a megohmmeter voltage level can use 500 Volt or 1000 Volt megohmmeter, insulation resistance value not less than 0.5 m Ω.
(6) low-voltage electrical equipment according to its nature and installation site load for testing and tuning, should meet the design requirements;
(7) quality and acceptance criteria:
Install the construction electrical engineering construction quality approval standard "GB50303-2002
The architectural engineering construction quality approval unification standard GB50300-2001
(8) verification information is as follows:
① product specifications, test records, certificates of competency;
② motor test record sheet;
③ motor inspection and wiring sub-item project quality approval sheet.
5. lightning rod (network) and earthing devices installed:
(1) comply with the following construction process:
Materials and equipment for grounding installation grounding installation laying down lead (net) installed lightning rod installation grounding resistance tests;
(2) roof installations of lightning network and metal components should be welded into a whole, down lead should use welding;
(3) lightning network and down lead and ground installations of fasteners should be used galvanized products;
(4) electrical appliance should tie in with the ground engineering construction at the same time, its hidden section first for intermediate inspection and acceptance;
(5) grounding (line) in depth from the surface to 1m, grounding of the pin should be anti-corrosion treatment, use galvanized flat steel welding of pin site anticorrsion paint brush should be compensated;
(6) vertical grounding of spacing of not less than twice the length and spacing of horizontal grounding not greater than 5m, grounding and buildings should not be less than the distance; 3m
(7) electrical apparatus partial each grounding should be separate to the grounding line and connected to the grounding line shall not be a grounding in the concatenation of several part needs to be grounded;
(8) quality and acceptance criteria:
Install the construction electrical engineering construction quality approval standard "GB50303-2002
The architectural engineering construction quality approval unification standard GB50300-2001
(9) supervise the construction units to overcome the following common problems:
① downlead lightning line not straight, not firm, downs and bending phenomenon, earth-leakage phenomenon cushion spring ring, etc.;
② grounding and zero line mixed received;
③ grounding electrodes into the underground depth, grounding depth, welding section is not standard.
(10) provides the following verification data:
① concealed work inspection record form;
② grounding resistance test record sheet;
③ sub-item project quality approval sheet.
6. construction and installation of structured cabling systems
(1) comply with the following construction process:
Construction inspection (pipe embedded, environment, equipment, safety, fire) device installation and cable laying cable termination system test
(2) the civil reserve hole, room surface settings, security, fire protection requirements for conformance to design requirements
(3) the equipment arrived at the scene, and the owner, contractor and make the following checks:
① appearance inspection certificate of manufacture, inspection reports;
② type, specifications, quantity complies with the requirements of the design;
③ various technological file is complete;
④ cable Fiber electrical properties, electrical properties of the test.
(4) equipment installation check: check the delivery room, equipment rooms, equipment rack, rack, wiring parts and various modules of the specification, the appearance, position, vertical, horizontal, and so meets the requirements, signs are complete, all bolts are tightened, the installation process, grounding and shielding, earthquake reinforcement and other installation meets the requirements.
(5) cable layout: trunking cable tray and place the cloth installation, installation, grounding, cloth line craft comply with the requirements; cables concealed, the piping, trunking, such as specifications, position, take the rightIndeed, in line with the design; when demand protection settings protection meets the requirements.
(6) cable end construction, eight-bit mode universal socket and wiring parts, fibre and various jumpers technology to meet the required, line order in strict accordance with T586B standards.
(7) system tests focus on engineering of electrical properties and cable characteristics for testing, test must include the following:
① connection diagram;
② length;
③ attenuation;
④ proximal crosstalk (both should test);
⑤ equipment required to test content;
⑥ power test records;
⑦ grounding system testing.
(8) verification information is as follows:
① equipment, equipment list and manual, certificate, test records;
② test records;
③ acceptance record;
④ concealed work inspection records;
⑤ sub-item project quality approval sheet.

【 Weak current College 】 overseeing corporate information management system



1. purpose: standardized and institutionalized and scientific management of the resident engineering project management team.

II. receiving record handler:

Communications → sign → registration → circulated → contractors → collection → archive

1, need to sign nuclear returned file:

Professional engineer (examiners) approval signatures → Project Director (Representative Director) audit signature, cover practising registration chapter → returns issued units

2, the forwarding of the file:

Professional engineer (examiners) circulated → Project Director (Representative Director) of the approved → forward

3. checking nuclear, seal the returned file:

Professional engineer (examiners) approval signatures → Project Director (Representative Director) audit signature, cover practising registration chapter → company seal → returns issued units

4, simply check the nuclear, check reading and archiving of documents:

Professional engineer (examiners) approval signatures → archive

5. where the contract or instructions of the required documents must be handled immediately, if not timely handling of files need to be addressed, in writing by giving back.

3. send handler:

The number of peer review draft → → → new → archive

1. the minutes by the Project Director (Representative Director) specifies the draft;

2. supervision of the person who issued the document and the draft regulations by this number;

3, the stamp of the file by the Commissioner, shall only be issued after signing;

4, the file is altered;

5. file after the issue by librarians for send registered and archived.

IV. admission, issued a registration:

1. receiving and issued a separate registration.

2. press information classification, belonging to the same number of registration.

3. economic visa independent registration.

4, engineering change independent registration (Director).

5, multiple units engineering projects, multiple segments of municipal engineering, Project Director, according to the actual situation developed, issued registration and archiving solutions.

5. information numbers:

1, archives and information on the company's unified number: A contractor, B supervision and c supervision internal use class, D survey design class, class E owners;

2, the project issued uniform numbering is as follows:

Issued number using MMi-Ni-XX forms;

MM: indicates that the project name in pinyin prefix. Such as "HW" expressed "Huawei", "I" indicates that the building number or section number;

Ni: represents the unified management of Government and company information classification number. Such as "B4" expressed "start order", "C2" and "engineering progress tracking table";

XX: indicates the serial number. Such as 1, 2, 3, ... N。

3. If the item has multiple units or section, information on acceptance, or section number again after the separation.

6. information on the archive:

1. press A, B, C, D, E by five separate archiving;

2. each category using the company's consolidated production prototype folder separated by classification number;

3, SSO information from company archives librarians assist management group of librarians in accordance with the requirements of the archives, the archive.

VII. transfer of information to the company:

Category → binding → SSO

1, the information is divided into two parts: the part of the monthly transfer; the other part, both before and after the completion of the acceptance of the surrender.

2. in accordance with the archives and the company's provisions (as described in the information category directory) are bound, SSO information appropriate to the original, special circumstances may provide photocopies;

3, binding order: cover page, table of contents, content information;

4, the Commissioner must hand in the amount of company information to confirm it, and in the "data directory table" signature, practising registration chapter;

5. transfer of information, the press archives and archives of requested information directory, information on the project's original independent monthly SSO;

At the end of each 6, last 3 days this month, the information shall be transferred to the company arranged;

7, the field data members to transfer information, you should fill in the "data" directory, and signed by the next turn.

8. supervision bodies information temporary surrender:

1. supervision agency personnel changes, you must add the management of information transferred to librarians, good written transfer procedures, Project Director recognition;

2. If the data member is on vacation or out of tolerance, the Commissioner shall promptly arranged officers took over the management of information and for written procedures for the transfer.

9. the transfer to the archives:

Collection → finishing → verification → binding → SSO

1. information requirements of staff by archives collects, collates information;

2. archives require scanning, recording the CD information must scan, recording the disc. (With archive files materials directory)

3, the total work do control the requirements check archives;

4, according to the archives section of the required directory, sort, page numbers;

5, librarians bound SSO archives;

6, scanning, recording a CD of data shall be turned over to the company.

10. provisions for the management of archives:

1. the consolidated tables, you must use carbon black ink or toner to print in black carbon, carbon-carbon copy paper should be used for single-sided, fill out the form or print the first use ofArchives at hand;

2, filling in the uniform used table should use the standard language, SI units, Gregorian year, month, and day;

3. sign the signature should be in the hands of habitual handwriting handwritten. The project director or Director of the representative and practising registered supervision engineers cover, units should be used for signing the bar register name and seal;

4. the uniform used table "table head" number "column of the provisions of the present system.

11. information on borrowing:

Project supervision body members with access to information must agree to before access to the information officer;

2. external units data access must be approved by the Project Director (Representative Director) of the approval in writing;

3. borrowing information only in the Office Access, timely restitution;

4. supervision of staff really work requires must be removed from Office, subject to the approval of the Project Director (Representative Director) of writing and reading time shall not exceed three days;

5. borrowing person shall remove, change or stained borrowed material, may not be reproduced without permission;

6. no point on the information, line drawing, altered, etc., do any tag.

12. information management:

1. to be able to use the computer processing of data is done by computer;

2, through the computer to complete the information must be filed at the end of the copy, together with the information; the company turned

3. information in accordance with A uniform, B, C, D, E classification requirements for filing, each category are located subdirectory subdirectory name is information number, and the floppy disk should be good tags and write protected estuary, marked with the project name and SSO month;

4. request scan processing, recording, optical discs, you must scan processing, recording discs; important in construction-related processes need to take photographs and digital camera, take pictures and must be in digital photography and recording the disc.

13. information custody:

Librarians responsible for good information confidentiality, security, anti, anti-lost, moisture;

2. maintain a clean, uncluttered information;

3. supervision group commonly used information, should keep a copy or copies saved for inspection;

14, fail data processing:

1. project completed Project Director (Representative Director) is responsible for the remaining information handed the company;

2, Project Director (Representative Director) and librarians appraisal report is retained;

3, the information is not retained after the approval of the Chief Engineer's Office.

15. the Director, the librarian's responsibility:

The Commissioner responsible for the oversight and management of information;

Information on information on the direct responsibility of the management burden.

16. implementation of the system of assessment:

17. system:

Management group language management system.

18. the table:

1, collect/send registration;

2. information transfer registration form;

3. information on the table of contents;

4. supervision of operators function in tables;

5. send a letter list supervisor;

6. information on borrowing registration form.

【 Weak current College 】 installation project estimates of



By direct project costs, indirect costs, profits and taxes.

Direct project costs: the direct consumption in the installation project constitutes a project entity and contribute to the formation of the various costs of projects, including direct costs and other fees.

Direct costs: consumption in the installation project constitutes a direct cost of the project costs. Including the main member fees, installation

Fee

Main member fee: installation of an item in the main equipment and material costs.

Main member fee = ∑ sub-item project quantity fixed consumption indicators main Member × × main materials of the current budget price

Main material fixed consumption = installation engineering × (1 + loss amount)

Installation fee: in the construction process consumed, constitute a project entity, the Foundation for a fixed charge fees. By artificial fee, material fee, charges for the use of construction machinery.

Labour cost = ∑ sub-item project in the corresponding project labor ×??

(Not including the project construction management personnel, material procurement clerk, machine operator's salary costs. )

Material fees = ∑ sub-item project in the corresponding project material costs ×??

Construction mechanical royalties = ∑ sub-item project in the corresponding project machinery costs ×??

Installation fee = artificial fee + material fee + construction mechanical royalties (= ∑ sub-item project quantity × fixed basic prices)

Other direct costs: project does not have to install direct costs include, but may occur in construction, have direct costs related to the nature of the charges. Including: winter rainy season construction, increased fees, night construction inspection test fee temporary facility fee.

Indirect costs: construction unit construction for organization and management, as well as indirect production for construction services costs

And. Including: management fees, labor insurance, other charges.

Profit: according to the national tax provisions included in the installation project cost profits.

Tax: the country's tax rules included in the installation project cost in business tax (3%), city maintenance tax (7%, 5%, 1%) and education expenses surtax (4%).



【 Weak current College 】 home decoration to choice trade-offs


Nowadays, the "light decoration, decoration" concept has been the hearts of the people, many owners are willing to be a lot of money spent on the new House of decoration. Remember what writer said, "the standard constant low and standards is becoming more and more people are not in the usual days too too good, standards should be how to bend. "Therefore, the choice of the home decoration to Chuck, shanfanjiujian, not don't decorate and foil, but rather to let the essence more dazzling. The following eight strokes of the application should you layout a new home to a multiplier effect.

Living room

Decorative light furniture heavy. Living room furniture usually will take you to a big budget, if you grasp on space decoration effect, or in some sense of shame, then please go back to those very simple furniture and rely on the accessories beautify living room. Furniture just accessories a stage to show it to others, jewelry show off your aesthetic taste, as long as you don't pay attention to the historical value of jewelry, we can achieve more with less.

Light walls to details. The wall is the largest area in the living room space, a lot of people put walls made of different textures, colors, with no good will is not coordinated and difficult to change, in fact, let the wall back itself refreshing colors on the walls of the accessories is completely shed wall. Several pieces of exquisite art, three two wall flower, or in the wall on a plate placed on small arts and crafts, and more from new ideas are free to replace, your life will be everywhere and deepens.

Bedroom

Light weight of the mattress bed tray. Bed in the bedroom is the most important in the function, while we are sleeping in a soft mattress, bed tray as long as strong and durable, color designs are having to play, but be sure to whatever our buy a good mattress, it allows you to obtain the full rest fully energized every day.

Light furniture heavy fabric. The bedroom is a place to rest, more furniture and decoration will make people upset, corner of Cabinet may be put on clothes, bedding and other spirits confused things displace, is there anything more than a clean and tidy people feel comfortable? and bedroom fabric makes the House becomes warm, the bedroom curtains, bed sheets, pillow, or foot, bench, if you can make them color coordinated, mellow, and in a few minutes you can have a bedroom, also for a good mood.

Kitchen

Light table to the table. Dining table is placed and bowls before they fall down, where used instead of direct use of the goods, we can not spend too much thought, and cutlery and table cloth is absolutely to carefully chosen carefully mix, match and coordinated tablecloth and napkin will become kitchen restaurant Vista, will make your appetite.

Light cabinets heavy electrical equipment. The Cabinet is the kitchen of the play, a large number of Cabinet is the most practical tools, electrical appliances and stove doors, handles, the storage function is to consider, but more importantly the rational allocation and electrical tools use the handy, heavy cooking labor will become simple easy and pleasant.

Bathroom

Heavy light reception of Cabinet. In order to tidy display bath products, to the extent possible, select a storage cabinet, will let space more fresh and tidy, guaranteeing supplies of clean, and various types of hooks will make the space look messy, slipping in the feet, it is also the biggest security risk.

Heavy light wash basin faucet. Bathroom appliances should focus on the use of function, wash basin and mixer, function simple nor a touch, so upon him without too many efforts, while the use of high-quality faucet is a kind of enjoyment, whatever the switching, the water is very gentle, due to the precision of style, but also stood the test of time, not easily damaged. And daily use related to province or provinces, similarly, Ware's select more concerned about its quality, but in the style and colours more effort on the province, because the wares in the bathroom, in a smaller, as long as the wall surface, ground excellent, sanitary ware will drown in the ceramic tile patterns and colors.

Wednesday, January 26, 2011

【 Weak current College 】 smart home wiring system solutions


According to the latest Intelligent home wiring standard — ANSI TIA/EIA standard combined with Austrian 570A profits In house ™ family of products provides Austrian innovation company of smart home solutions. For a single residential wiring system, typical wiring system diagram as shown in the figure below.
   
Usually a residential unit only including workspaces, levels, and management zones in three sections.
  
1. work area: workspace is mainly composed of panels and modules. Austrian innovation taking into account the application of a beautiful family, specially developed for residential use In house ™ series Panel, with its interface Tracjack module includes RJ45 (8P8C), RJ25 (6P6C), coaxial, optical fiber ST, SC and dual RCA for sound control. According to different application select the corresponding module.
  
2. horizontal area: horizontal area mainly consists of various cables. According to the standards, different 570A applications using different wiring. For voice system cable choice meets ANSI TIA/EIA standard three-class or category 5 UTP, but it is recommended that you use category 5 cable; cable for data transmission, you use the ANSI TIA/EIA568A standard cat 5 UTP cable, anti-interference for communication bandwidth or higher, you can use the cable as a transport medium. Video signal transmission with SCTE (communication cable engineers) 75-Ohm coaxial cable ZPS-SP-001, using coaxial cable without expensive adapter and cannot meet the bandwidth requirements, saving the user's investment.
  
3. Administrative District: management area is used In Austrian innovation companies house ™ installation box with In house ™ series Panel. In house ™ installed box for twisted pair and coaxial and fiber for multimedia applications. You can manage a residential unit of voice, data and image transmission system. In house installation box installed in the Interior of the residential unit, users can easily change or grow, without being a professional training.
  
Main area: for multi-storey buildings, apart from the above individual home unit wiring system of the workspace, horizontal zones and management area, you also need to make each home unit is connected to the Central Administration of main areas and manage the entire building wiring system of the main management areas. Typical trunk wiring system diagram shown in the following figure, building backbone topology is star-shaped structure that the domestic In house wiring boxes and building main wiring
  
Multi-storey buildings typical trunk wiring system
Room together. Another alternative is the main wiring scheme every two or three-tier set an intermediate wiring, an intermediate wiring management II, three floors, with two levels of trunk system. The trunk can be large logarithms cable, coaxial cable, or fiber optic cable (optional). For backbone cabling may park in each building sets a primary distribution cable, then connect through the building to the Park between the trunk (or community) main distribution center.
  
The main wiring design the first way is: according to the application of the system are using copper distribution frame, coax and fiber distribution frame. Where the copper distribution frame can be used for various electronic signal is connected to the vertical line and through jumper control all distribution frame of weak signal routing to enable voice signals and other electronic signals in centralized management purposes. For a computer system, you can use copper distribution frame or using optical fiber distribution frame trunk cable comes into the main distribution.
  
The main wiring between the design of the other way is: the Austrian innovation company quickly meet-distribution frame. This distribution frame features can be workstation needs multiplied cable equipment exports between providing unmatched flexibility and compatibility. Through the matching of various 1 rack unit height of embedded module, you can meet the most complex multimedia system, module loading and unloading from the front panel to facilitate future capacity increase, move, or replace.

【 Weak current College 】 newly installed elevators acceptance inspection application procedures



I. the inspection basis
According to the special equipment safety supervision Ordinance 21: boiler, pressure vessel and pressure piping components, lifting equipment, the large amusement facilities manufacturing process and boiler, pressure vessel, elevators, cranes, passenger ropeway, large-scale amusement facilities, installation, renovation, major maintenance procedure, must be approved by the State Department special equipment Security Administration approval testing and inspection bodies in accordance with the security specifications for supervision and inspection; without the supervision of qualified delivery shall be ex factory or. Second, examination standard
1, elevator control and inspection procedures;
2, the elevator installation inspection specifications (GB10060-1993);
3, the elevator manufacturing and installation of the security code (GB7588-1995);
4, the escalators and passenger conveyors of the Statute of the monitoring and inspection;
5, the escalators and passenger conveyors of the manufacturing and installation of the security code (GB16899-1997);
6, the rules for the inspection of modifications supervision;
7, the service lift (JG135-2000);
8, the hydraulic elevator control and inspection procedures;
9, the hydraulic elevator (JG5071-1996). III. application for inspection
Hold the following information to the application:
1, use the elevator inspection units complete the application form (required to cover the use of flat seal);
2. inspection fees payment voucher;
3, inform the Attorney, told the book receipt;
4, machine certificate;
5. packing slips;
6, the sales contract;
7, post address and post record;
8, try running records;
9, concealed construction of record;
10, if you have changed the original construction programme, there should be a change in the construction of record.
Such as the use of units of application materials is incomplete or does not comply with the statutory form, on the spot or in 5 days time inform the applicant of the required correction. To complement the information to the applicant, giving the admissibility and arrange for the appropriate test. IV. service acceptance
In accepting applications, 10 working days of the scheduled inspection, quality and technology supervision given to the scene of an administrative decision on the application inadmissible. 5. implementation of the field-conditions
1, elevator for post, do a self test reports;
2. ready rated load of 125% of the standard test weights;
3. prepare the relevant files, System (Elevator electrical schematics, Elevator administrator actions card, etc.) for future reference;
4. elevator use, installation units should arrange relevant professional personnel to the scene with inspection. 6. test report to produce and disseminate
Inspection is completed, within 10 business days to produce the "elevator inspection report". Probably this is the case, specific or where do you want to see!

【 Weak current College 】 logistics special equipment serious accidents emergency plans


** University logistics special equipment serious accidents emergency plans

(Draft)

In order to be effective in the prevention, control and eradication in a timely manner of the special equipment to serious accidents in compromise, minimize the damage caused by accident, the maintenance of school stability, according to the special equipment to monitor the Ordinance, combined with the actual, centred on enactment of the plan (draft).

First, the guidelines and objectives

The party's 16 th and important thinking as a guide to uphold the prevention primarily, self-help, and unity of command, the principle of the responsibility to prevent sudden serious equipment accident, and in special equipment after the accident, a rapid and effective control, prevent Group dead injury accidents, and after the accident, a rapid and effective control of the treatment, prevention of injury and death group group to ensure that teachers and students of life and property safety and school stability.

Second, the basic conditions and special equipment logistics of danger

Under the special supervision Ordinance, our logistics system device configurations are special equipment: passenger elevator eight; life boiler two, liquefied (LPG cylinders) 171 only.

These equipments are mainly in the form of accidents: elevator accidents, boiler explosions and fires caused by leakage of liquefied gas cylinder explosion.

3. serious safety emergency rescue organizations agencies

1. logistical serious security incident response team

Group leader: ***

成员:***、***、**********************************************

2, district tablets (onsite) accident rescue command (responsibility)

The school meals system special equipment accident rescue — — — — — — — — — — — ***, ***

** * Campus: dormitory area gas tank accident rescue — — — — — — — — — — — — — ***

* ** * Campus: Hostels passenger elevator, campus dining hall special equipment accident rescue--***

** Campus: student hostels gas tank accident, campus dining hall special rescue — — — — — ***

3. serious safety emergency rescue organizations sector responsibilities:

① leadership team responsibilities: check the urge to do serious accident prevention measures and emergency preparations (acquisition of various emergency standby equipment); Organization of major emergency drills; the time of the accident, the leadership team that is exercised emergency headquarters, organize and direct on the special equipment to serious accidents on-site emergency rescue work.

② field command (liability) duties: urgent call to participate in the emergency department or unit in charge of on-site relief programme, a clear division of responsibilities in all sectors; command on-site emergency relief work.

③ accident unit responsibilities: each accident unit to actively carry out self-help work at the same time, rapidly to the district command (liability) and logistics special equipment accident report, proactive headquarters with serious accident emergency rescue command do rescue work and provision of the necessary rescue equipment and tools.

Fourth, serious accidents, emergency and rescue procedures

1. special equipment accident occurred, the campus and the appropriate related field command system immediately start: field command as a responsibility of command as soon as possible in accordance with established emergency response plan immediate on-site emergency self-help;

2. special equipment accident occurred emergency: first you want to organize and direct the students evacuated, away from the scene of the accident, and strive to no casualties; second, in accordance with the plans for the immediate implementation of the fight against the spread of accident, accident prevention, expansion, strive to make accident losses reduced to a minimum, a third to do emergency rescue never delay, not shifting.

3, immediately report the logistical serious security incident response team and school leadership, request directions or by leading group of officials rushed to the scene on the direct the rescue work.

4. the event of a major accident or when special equipment of special equipment of the serious accidents cannot quickly be effectively control, report 110, 119 and report to the municipal office to request emergency rescue command in the special equipment to provide support.

5. serious safety emergency disposal measures

(A) boiler explosion

1, prompt rescue the wounded, managed to put out the fire source, prevent the spread of fire, such as fire-fighting machine, equipment or water, immediately contact the Fire Department on scene processing.

2. cut off the device's power, water, organization and personnel evacuated rapidly in the vicinity of the accident site.

3, immediately remove the scene of inflammable and tanks.

(B) of the LPG tank and pressure pipeline leak

1. determine the air leakage location, approximate air leakage from the wind.

2. all fire quickly extinguished, turn off the power to stop production.

3. close the valve at the upper air leakage.

4, fire sprinkler will escape of gas LPG dispersed.

5, a large number of leaks, you should quickly organize on-site and nearby personnel evacuated rapidly and quenching fire, turn off the power and communication facilities.

(3) LPG fires

1, gate leakage, cut off the power. If a fire occurs in the tank farm, with back tank conditions, should promptly down tank.

2, asphyxia fire, put out the fire district. Using large amounts of water jet method.

3, cooling, fire to the fire zone Eruption (carbon dioxide, dry powder, spray water), the container to the adjacent fire sprinkler or open water curtain surface water.

(4) LPG cylinderFire

1, if it is continuous rubber hose or stoves leak fire, should quickly close the valve.

2. If a pressure reducing valves or valve leak fire, may use the wet towel or wet, will cover the ignition point, bring it into line with air insulation.

3. If the fire is large, could not close cylinder, you should first try to put out the fire, as covered with sand, or off water machine, fire extinguishing agent, and other equipment to quickly control the fire.

(5) the passenger elevator unsafe State

1. lift out the safety clamp is not in effect, the passenger first press the emergency stop button, at the same time to do afford cabin emergency stop or recoil, dun impact bottom and prepared (usually take the legs, stooped posture), after the use of communication facilities (such as alarm, emergency phone) Device Manager immediately to the scene to organize rescue.

2. in case of fire, the driver should do to lift up to the safety of the floor (General fire-following the floor more secure), following the withdrawal of the boot of passenger safety, then cut off the power to fight the fire.

3, elevator in the fixed line sudden stop trapped people, passengers should first press the emergency stop button, then use of communication facilities (such as alarm, emergency telephone, mobile phone) Device Manager immediately to the scene to the rescue. Rescue workers used spare hand wheel mobile car-leveling, after rotating door machine pulleys, open car door, allowing passengers to leave the car.

VI. special equipment accident emergency rescue equipment and supplies

1, according to the characteristics of special equipment for our school, targeted to emergency repair, personal protection, general medical help, communications and other equipment equipped. Do you want to be in service maintenance, preservation, testing, ensure that the equipment is always in good condition, to ensure effective use.

2, the use of special equipment of the sector to follow task Division do all kinds of equipment configuration. Such as communication, fire, rescue, Limin, deterring leakage, anti-virus, repair, and other equipment and a variety of tools.

VII. Special provisions on emergency rescue signal

1. main alarm phone as follows:

Unit alarm phone

110

Gonganxiaofangzhidui 119

Emergency Center 120

Quality * ** * ** *

Administration * ** * ** *

EPA * ** * ** *

2. school main office phone:

The principal's Office * ** * ** *

The Logistics Department * ** * ** *

Security Department * ** * ** *

Medical * ** * ** *

8. rescue team training and exercises

In order to strengthen the use of special units of the rescue team of rescue skills, improve the cooperative engagement capability, the special equipment to serious accidents and emergency rescue team shall be a reality, for all kinds of accidents that may occur each year to organize a simulation training and exercises.

1. pick some healthy, mature technology, experienced personnel.

2, in order to ensure the implementation of the first quarter of each year based on mobility, in order to avoid useless.

9. serious accidents occur, this plan and the ** **, serious accidents, emergency plans, and implementation.



** University of Logistics Department

2005 February 14

【 Weak current College 】 communication system engineering construction site coordination and control



Construction content overview
Modern communication including multimedia communications, computers, communication networks, personal communication, digital image communications (videophone) and mobile satellite communication, PBX, voice mail and e-mail, etc. In our country, the telephone network is the most basic communication carriers, it automation will reflect on the hardware architecture and software design, such as programmable, can exchange, automatic billing and to form a global network systems. Telephone communication line from gas pipeline outlet boxes, and so on until the user, respectively, as follows:
(1) communication wires introduce (House): through the cable ducts or direct buried from underground gas; through the cable ducts or direct buried, drop by the outer walls; through the aerial cable from exterior House.
(2) PBX room or wiring device:
1) communications cable introduction inside settings user-controlled machine, using the total wiring box or total distribution frame, this room is called the phone room.
2) communication cable introduction estates do not set a user-controlled machine, telephone, gas cable over the transfer box, this room is called the telephone connection.
3) phone room or transfer settings in between to one or two layers, such as a basement and a dry, well-ventilated, consider calling room or call handover between set down in the basement.
(3) vertical cable wearing floor rise pipes, pipe laying along the shaft.
(4) cables laid in the floor horizontal pipeline or cable trunking (tray).
(5) wiring equipment; cable connector box, crossing boxes, junction box, user outlet boxes, communication lines branch, intermediate inspection, terminal equipment.
Construction site coordination points
1. construction and civil engineering structures with
(1) building with basement, drop by the external communication cable to the ground floor, in communication cable entering external location natural flooring-0.8m, embedded with waterstop wing ring of steel casing, General casing pipe diameter greater than 2.
(2) the building without basement, communication cable drop tube can be directly embedded in the wall body concealed, the pipeline can connect to that charge transfer box or out with the back of the line box in the center of embedded cassettes.
(3) pursuant to communication departments design of manhole wells or hand hole shaft geometry size and position size by civil construction drawings, masonry, professional assistance and configure cast iron shaft ring and cast iron manhole cover.
(4) communication cable pipe buried under the natural floor, building 0.8m following apron 1m above.
(5) communication cable lines through the exterior casing, into the human Interior pipe length is not less than 30cm to pipeline connection, ease of construction operations.
(6) communication cable across the Canal and the gaps between the casing, oil, hemp twine for asphalt sealing paste for interior walls, external and both sides should block, and then do the construction facade waterproof treatment.
(7) with the construction of civil structure, Telecom professional builders with embedded floor inside dark piping, dark couplers, crossing the junction box, user outlet boxes, etc.
(8) provide to civil engineering floor type transfer box base base construction drawings, from civil professional assistance to complete the Foundation construction. The base should be not less than C10 concrete production, a height of not less than 20cm. And at the base of the four corner holes 4 root M10× 100 long galvanized bolts to fixed transfer box and in the base of the central reserve communication cable inlet holes.
2. construction and civil engineering outside line with points
(1) direct embedded communication cabling: trench excavation, backfill, leveling, earthwork construction by civil professional assistance, communications professionals meet the construction.
1) civil construction communication lines buried cable, requires that the shop around the cable 50 ~ ·adjustment sand or fine soil, brick and concrete block cover and then backfill.
2) buried cable through roads, pipelines, and should have a spare tube.
3) buried cable line segments each 200 ~ 300m, cable connecting points, branch points, left, direction change Department of cable routing and pipeline intersection, set cable markers.
4) communication cables directly buried into the Interior, buried cable desired approach people building indoor line equipment, exchanging raw lead package cable wear hose introduced. As to the separation line equipment distance within the 15m, armored layer off after wear hose to the line device.
(2) aerial cable laying: aerial cable laying a rod should be timely to construction outside line construction personnel and other professionals outside the pipeline construction personnel understand the communication cable routing, various pipes embedded in the pipeline overlapping, touch, cross, horizontal and vertical spacing does not meet the specification requirements, etc., to be coordinated and soil fertilization. At the same time should note the following:
1) communications cable overhead, is apart from the ground, pavement minimum distance 4.5 ~ 5.5m.
2) communication cables and power cable should not be the same tower erection. Using the same tower erection, its communication overhead cables hanging height and other line spacing should be greater than or equal to 0.6m.
3) adopts hanging lines hanging communication cable, each communication overhead cable capacity is less than or equal to 100 pairs; if a crane line hanging two communication cable, two cables of total capacity of not more than 80 on.
4) communication cable cableway generally use concrete pole, and electric power lines with rod laying out, Rod distance is 35 ~ 45m.
3. and civil engineering construction combined with elements of decoration
(1) PBX room attendant by switch rooms, Hall, room or the UPS batteries (maintenance-free lead-acid batteries) made up of three parts. On civil decoration construction requirements are as follows:
1) switch room floor height is greater than or equal to 3m, if 2.6 ~ 2.9m elevated rack, the height is greater than or equal to 3.5m; floor load low shelf rack, greater than or equal to 450kg/m2, using overhead rack, greater than or equal to 600kg/m2; the ground floor with activities or plastic surface should be anti-static, fire-retardant; light steel joist ceiling or cement-lime mortar plastering, surface coated urea Matt paint, door1.2 ~ 1.5m, aluminum alloy or external opening two door; double window seal is tight, dust, temperature and humidity by setting the control of ventilation and air-conditioning system.
2) operator room floor height is greater than or equal to 3m; floor loads greater than or equal to 300kg/m2; wall cement mortar plastering, surface coating and environment-friendly paint; ceiling with cement mortar plastering, surface coating and environment-friendly paint; doors, Windows should be able to dust; indoor temperature and humidity control by a ventilation and air-conditioning system.
3) battery compartment floor height is greater than or equal to the ground using acid 3m; tiles; floor loads greater than or equal to 600kg/m2; wall plastering cement-lime mortar, acid-resistant surface coating (or alkali) paint; door good dust; the use of double Windows, outer window with frosted glass; indoor temperature is 10 ° c above, and set the ventilation exhaust device.
(2) communication professional construction staff with civil professional activities floor construction. Based construction drawing communication cable routing installation of trunkings, usually in the Cabinet following along the activities under the floor should be as floor following communication cable have difficulty, you can use above the floor laying cable trunkings.
(3) in the laying of trunkings ceiling should be coordinated with other professional trunkings routing is hindered by other pipeline layout, coordination of the various professional pipe pipeline layout elevation and location coordinates, and order by order of procedure.
(4) communication professional builders downlead box (carton), pipeline construction, attention to finished product protection, no casual damage other professional has finished products, semi-finished products for construction, etc.
Construction site control focus
(1) audit communications system construction drawing system diagrams, floor plans, equipment installation, whether by detail drawing and so have the legal qualification of design unit design, confirm construction drawing available before construction.
(2) read construction drawings, you will find a summary of issues central to the design, organization design gives the low-down, put questions to form solution, to be checked to confirm, Wells InCharge design change process.
(3) audit communication system engineering construction organization plan:
1) understand communication system engineering in the engineering, the engineering, construction, control of the construction process and quality control manager.
2) audit communications system construction materials and equipment used for processing orders for planning, workforce scheduling, construction schedule, and so should the General and civil engineering construction schedule, make sure that the total duration of a schedule.
3) communications systems engineering construction technology gives the low-down: communication PABX telephone station building in vertical and horizontal communication cable construction (especially optical cable construction), terminal equipment such as box (carton), etc., on the process requirements, quality management and control requirements, security and protection are all conducted technology gives the low-down.
4) must be provided by the Ministry of posts and telecommunications access national communication network used by PABX, must have network access license issued by the Ministry of posts and telecommunications. Therefore, user selection purchase, be sure to purchase a PTT network access license issued by the program-controlled switches.
5) in order to avoid AC into PBX, burned circuit board, therefore, in the comprehensive wiring system distribution frame and communication access network junction, should be installed with normally open contact of the security element.
6) connection terminals for cables, plates and other major communication equipment electrical performance testing should be sampled. When the relative humidity of 75% with 250V megohmmeter test, cable insulation resistance value should not be less than 200 M Ω; Terminal Board adjacent terminal insulation resistance value should not be less than 500 M Ω.
7) PBX room grounding device can use of common ground. Common ground grid should meet the contact resistance, contact voltage and stepped voltage requirements. Room protection earthing may use three-phase five-wire or single phase three-wire grounding.
8) programmable switch room, in order to reduce the high frequency resistance equipment grounding wire should be laid with copper conductors.
9) PBX room, should be set for general use-DC grounding wire, copper belt for 120mm×0.35mm.
10) when using 200 door following PABX, grounding resistance value should be less than or equal to 5 Ω. When various grounding device adopts joint grounding, grounding resistance value is equal to 1 Ω.