【 Weak current College 】 flooring laying of acceptance criteria
Wood floor is the living room and a public building decoration and commonly used in decorative materials. Necessary wood flooring laying pavement acceptance develop basic requirements. The following describes some of the wood flooring laying construction method of acceptance
Wood flooring material varieties, grades meet design requirements, the moisture content should be in the 10 or so, with the laying of the keel, the pad is made before the acceptance of anti-corrosion treatment, wood joist to install a solid, flat, spacing and fixed method of compliance requirements, the Board shop nail firmly, without loosing, paste, no empty drum, the use of plastic varieties comply with regulatory requirements.
Visual acceptance the laying surface planing of wood floor flat, polished, no scars, Russia stubble and Burr, clear, clear oil layer color, laying in the right direction, facing tight seams, joints staggered, surface clean location. Skirting the laying seams carefully, smooth surface, the height and thickness of the wall. With 2 m on foot to check that the ground laying flatness error is less than 1 mm, the width is less than 0.3 mm gap, skirting outlet laying straightness error is less than 3 mm, abutted straightness error is less than 2 mm.
Wood floor construction for the laying of the common quality problems and solutions
Wood floor laying down common quality problems are walking free drum sound, the laying surface uneven, slot, local curling drum, etc.
(1) free drum sound: the reason is that wood flooring laying fixed false, mainly wool slabs and keel, wool Board and floor nail quantity rarely or nails not in jail, sometimes due to changes in moisture content sheet contraction or glue is not eligible. Control methods in addition to strict acceptance sheet moisture, adhesives, and other quality, after acceptance, the installation can only be used when the nail too small and should ensure that nailed, laying out a piece of wood flooring, using foot inspection no sound after install a piece, if the noise should be instant rework.
(2) in the laying surface uneven: mainly due to the laying of grassroots uneven or wood flooring strip deformation caused by Arch. In laying construction, application level gauge acceptance, on the keel surface leveling, if the laying of uneven pad should adjust. Keel ventilation small Groove should be done. Laying of wall plate margins should be set aside 10 mm ventilation slot. Heat insulating and deadening materials must be dry to prevent operation bagging, moistening the floor. Wooden floor surface flatness error should be less than 1 mm.
(3) slot is not strict: in addition to construction, laying not spec sheet width size error big piece together the poor quality of processing is also important because, in addition to careful inspection of the quality of the floor, when Openning MUI installed should be tiled, the plate before nailing Staples, the module will have consistent floor slotted dies before the nail.
(4) the local curling drum: main reason besides the Board gets wet deformation, there are gross plate slot is too small or seamless, use pipes leak caused by soaking wet floor. Under construction to wool board stay 3 mm gap, carved wood joist. ventilation slots Floor surfacing, brushing floor paint should complete the film, for daily use to prevent the water flows into the lower part of the floor, to clean the surface of the water in a timely manner.
Wood floor construction for duration estimates
Wood floor laying is highly technical, it and other items of parallel jobs. It normally takes one week to complete three-room construction tasks, including wood joist installation and primary moisture treatment for two days, wool panels and flooring installed two days, the floor surface planed ground flat day floor paint Daubs two days. Indeed, Fabio empty shop less labor law, floor specifications much smaller than the specification work, floor paint, quick-drying of elements than slow dry, specific time should according to construction methods, materials, products, etc.