Thursday, March 3, 2011
【 Weak current College 】 housing renovation completion acceptance is the basic
Typically, the housing conditions of acceptance:
The housing must have quality inspection station issued by housing quality certification. In accordance with the relevant regulations before using the housing delivery, must be subject to quality inspection station District Housing, the acceptance in order to allow the tenant to live. In this qualified documents, household himself to housing for quality checks, the discovery of problems to solve.
Where completion of the project, shall generally be "five-one flat," i.e., gas, water, electric heating, sewage, which is a flat road, in front of the building after building, 6 m, 3 m venues to flat, stacked building materials or debris to ensure access to security. To gas meters, electricity meters (Unit table), water meter three tables to the home. Indoor cleaning clean, pool, water basins, latrines, trash, door, glass, pipeline clean, no dirt, reaching window implicitly NET, floor drain, rain etc without clogging debris.
High-rise residential building, domestic water supply system in the health sector must be issued by the water quality. It is important to note that serious water quality in Beijing, some community over water are all on your own drilling wells for water, just in case, such community in acceptance of the housing, it is best to own mining some water to take home, to the relevant departments to verify, if water does not comply with the domestic water standards, they should try to solve.
High-rise residential building elevator, you must have the safe operation of the Labour Department issued certificate.
High-rise apartment building fire service, must be tested by fire departments.
The housing documents according to drawings, required equipment, functional and reliable procedure complete.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment