Thursday, December 23, 2010

【 Weak current College 】 how to sign a contract for the decoration of confidence


Home renovation process will inevitably produce a contract dispute, how can I sign a satisfaction of family housing renovation contract? General, home contract disputes often appear in the following aspects: first, on the contract file a relatively complete home contract in addition to the project budget, design drawings, you should include key construction project of construction technology, construction plans and parties of materials procurement. Construction technology is a constraint construction party strictly enforce the Convention process practices, prevent shoddy work. And in the contract to have a construction plan, mainly because of the current family decoration delay duration aberrations, while consumers are very difficult to start the construction delay duration when they discovered the problem, therefore, a more rigorous construction plan is essential for consumers to protect themselves. Now a lot of home improvement contracts for contract parties of materials purchase orders are not too seriously, even though the contract a number of provisions, but most of them relatively superficial, mainly reflected in for material brands, purchasing time frame and acceptance of, acceptance of staff did not make explicit provision. Therefore, the above contract in home decoration which are generally easy to ignore some files try not to miss. Second, on the design drawings of many family decoration of disputes are reflected in the understanding of the project. For example, on some projects of understanding, in the absence of more detailed drawings, designers and consumers understand that there will be some gaps in the project because of the drawings is ambiguous, in specific dimensions on the gap. Therefore, it is recommended that you sign the contract, as far as possible, drawing prepared, avoid starting later these work without unnecessary trouble. III. project budget for the decoration of the project budget, the current formal decoration company to consumers in general are relatively complete. A report based on the current use of the Shanghai family room decoration engineering construction contract related tables out of the project budget, including the project item, quantity, unit price, reference materials, and so on, key projects basically does not have any defects. However, some consumers do reflect, project settlement, the settlement amount and their expected always have gaps. In fact, apart from in the construction process of the project change the cost changes, the main reason to hydropower reform. In fact, in the decoration company and consumer contracts concluded home, as some cases at this point very clearly, so quotation mark is in the general reconstruction projects hydroelectric power, the total cost of the unit price is not included the cost of reconstruction of hydropower. And project settlement, is the settlement of all projects, the gap is inevitable. So, here we recommend you to ask decoration company in project quotation to you a hydropower reform reference quote. 4. avoid to do many of the provisions of the home decoration of complaints are not practical terms of the contract. Contractual provisions in the relevant basic under project quotation is not up to quality of construction, the contract provisions in any of the conditions are not possible in terms of indoor air environment. For example, has one of the owners of the additional terms in the contract, called "decoration was completed, professional monitoring bodies to monitor indoor environment, requiring indoor absolute environmental protection". But what is an "absolute environmental"? first conceptually confused, not to mention those who decorated house there are different degrees of environmental pollution problems, any person or company can do "absolute environmental protection". Therefore, the market for contract certification when the request is not supported in General. It is recommended that you sign a contract, don't consider that in the current market reality in order not to requirements. Because even if they do, decoration companies in order to sign the contract also agreed that in the future, or at least trouble.

No comments:

Post a Comment