Monday, December 27, 2010

【 Weak current College 】 check a reassuring renovation contract


The contract is signed between the home decoration new house in a first step, first of all to grasp a principle is: sign the contract when the heart is no longer a concern. Consumers before coming to home decoration company, want to learn about many things: there are about engineering quality, decoration materials, design, service, complaints and renovation contracts, etc. For these questions if you don't mind, as not to hurry to sign the contract. In addition, if the decoration company in negotiation process frequently change negotiators, you should understand clearly what is the cause, if this is due to the movement of persons, the contract should be more careful.

Home contract disputes often appear in the following areas:

On the contract file a relatively complete home contract in addition to the project budget, design drawings, you should include key construction project of construction technology, construction plans and parties of materials procurement.

Construction technology is a constraint construction party strictly enforce the Convention process practices, prevent shoddy work. In the contracts which have a construction plan, mainly because of the current family decoration delay duration of more serious, but consumers also difficult construction start delay duration when they discovered the problem. Therefore, a more rigorous construction plan is essential for consumers to protect themselves. Now a lot of home improvement contracts for contract parties of materials purchase orders are not too seriously, even though the contract a number of provisions, but most of them relatively superficial, mainly reflected in for material brands, purchasing time frame as well as the acceptance and inspection personnel make no explicit provision in the facets. Therefore, the above contract in home decoration which are generally easy to ignore some files try not to miss.

On the design drawings of many family decoration of disputes are reflected in the understanding of the project. For example, on some projects of understanding, in the absence of more detailed drawings, designers and consumers understand that there will be some gaps in the project because of the drawings is ambiguous, in specific dimensions on the gap.

Therefore, in the contract, as far as possible, drawing prepared, avoid starting later these work without unnecessary trouble.

On the project budget family decoration project budget, the current formal decoration company to consumers in general are relatively complete. A report based on the current use of the Shanghai family room decoration engineering construction model contracts relevant tables out of the project budget, including the project item, quantity, unit price, and reference materials, and so on.

Some consumers do reflect, project settlement, the settlement amount and their expected always have gaps. In fact, apart from in the construction process of the project change the cost changes, the main reason to hydropower reform. In fact, in the decoration company and consumer contracts concluded home, as some cases were not very clear, so when quoting is generally marked improvement projects hydroelectric power, the total cost of the unit price is not included the cost of reconstruction of hydropower. Project settlement, is the settlement of all projects, the variance is inevitable. Therefore, I recommend you here, to request a quote in engineering decoration company, give you a quote for hydropower reform of reference.

Avoid to do many of the provisions of the home decoration of complaints are not practical terms of the contract. Contractual provisions in the relevant basic under project quotation is not up to quality of construction, the contract provisions in any of the conditions are not possible in terms of indoor air environment. For example, has one of the owners of the additional terms in the contract, called "decoration was completed, professional monitoring bodies to monitor indoor environment, requiring indoor absolute environmental protection". But what is an "absolute environmental"? first conceptually confused, not to mention all the houses are decorated with different degrees of environmental pollution problems, any person or company can do "absolute environmental protection". Therefore, the market for contract certification when the request is not supported in General. So, don't sign a contract to consider those in the current market reality in order not to requirements. Because even if they do, decoration companies in order to sign the contract agreed, or at least trouble.

No comments:

Post a Comment