【 Weak current College 】 construction site English 500 words (16)



18. quality management
QUALITYCONTROL
425TotalQualityControl(TQC)isabetterqualitycontrolsystem.
Total quality control (TQC) is a good quality management system.
426TQCovertheprojectwillbestrengthened.
For this project will enhance the overall quality management.
427Tomaintainthebestqualityoftheconstructionworkistheimportantresponsibilityofthefieldcontrollers.
Keep the good quality of construction work is site management of important responsibilities.
428Wepossessskilledtechnicianandcompletemeasuringandtestinstrumentsusedtoensurethequalityofengineering.
We have a skilled technical force and complete detection means, you can ensure that the quality of the project.
429Fieldinspectionworkishandled(executed,directed)byourInspectionSection.
On-site inspection by our inspection section management (implementation, guidance).
430OursitequalityinspectorwillreporttotheProjectManagereveryday.
Our on-site quality inspector will be a day to the project manager.
431Iwanttoseethecertificateofquality(certificateofmanufacturer,certificateofinspection,certificateofshipment,materialcertificate,certificateofproof).
I want to see quality certificates (factory certificate, inspection certificate, export licenses, material certificate, inspection certificate).
432Hereisthereportofchemicalcompositioninspection.
This is the chemical composition of the inspection reports.
433IsitOK(good,guaranteed,satisfied,passed)?
That is correct (the good, the guarantee of satisfaction, qualified)?
434Weshalltakethesampletotestitsphysicalproperties(mechanicalproperties,tensilestrength,yieldpoint,percentageelongation,reductionofarea,impactvalue,Brinellhardness).\
We will test their physical performance sampling (mechanical, yield point, tensile strength, elongation rate, shrinkage rate section, the impact of value, Brinell hardness).
435WehavereceivedCertificateofAuthorizationforthefabricationanderectionofpressurevessels.
We have a pressure vessel fabrication and installation of authorized certification.
436Theweldspassedtheexaminationofradiographictest(ultrasonicinspection,magnetictesting).
The welding seam by radiographic check (ultrasonic inspection, magnetic particle testing) certified.
437Areyouaqualifiednondestructivetesting(NDT)person?
You have the qualifications of nondestructive testing personnel?
438Letusgotothelaboratorytochecktheradiographicfilms.
Please go to the laboratory to check the perspective of the film.
439Thisjobwillhavetobedoneoveragain.
The work must rework the redo.
440Thedefectmustberepairedatonce. defects must be repaired immediately.
441Thisproblemofqualityneedsafurtherdiscussion.
The quality is always a need for further discussion.
442TheISOstandardshavebeenusedbyourcompanyinthisproject. international standards (ISO) has adopted for our company to this project.
443Thetestingresultsfulfillqualityrequirement.
Test results meet quality requirements.
444Checklist(qualityspecification)hasbeensignedbythecontroller(inspector,checker).
Automobiles (quality manual) have been determined by the administrator (Inspector and Auditor) signature.