【 Weak current College 】 construction party may claim



Contract claims

1) contract file composition of claims.

2) on the validity of the contract documents.

3) because of the drawings or quantities of error arising from the claim.

2. engineering construction claims

1) conditions for changes in the claim;

2) engineering artificial obstacles arising from the claimant;

3) increased or decreased the amount of the claims project;

4) various additional test and examine the costs of payment;

5) engineering quality requirements change claims;

6) nominated subcontractor default or delay caused by the claim;

7) other related construction claims.

3. price claims

1) with regard to price adjustment;

2) due to the delay of the claims for losses arising;

3) rush fee.

4. the claim for

1 extension of duration);

2) due to the delay of the claims for losses arising;

3) rush fee.

5. special risks and manpower unpredictable disaster claims

1) special risks of claims

Special risks generally refers to wars, hostilities, intrusion, enemy action, nuclear pollution and destruction of shock wave.

2) manpower unpredictable disaster claims

Manpower unpredictable disasters mainly refers to natural disasters, by such disasters caused by the loss of insurance claims. In many of the contract the contractor to the owners and contractors on behalf of the joint project of all risks to be insured, such claims can be made with the owners together.

6. project suspended, terminated the contract claims

1) construction process, engineer to order to suspend the whole or any part of the project, as long as the pause command is not in breach of contract or other risk to the contractor, the contractor can not only get request duration extended rights, but also on their down losses for reasonable additional expenses compensation.

2) terminate the contract and suspend work of significance is different. Some are due to damage caused by the accident risk is serious and therefore terminated contract, some are "error" caused by the termination of the contract, such as the owners that the contractor is not performing and termination of the contract, or even expulsion from the site of the contractor.

7. financial cost of compensation claims

The financial costs of loss compensation, which is the reason that the contractor financial expenses increase as a result of loan interest and other financial expenses.