Wednesday, January 26, 2011

【 Weak current College 】 resolution decoration budget trap and coping methods


A total renovation budget analysis, decoration budget is a decoration and owners signed contract, pull into engineering and project settlement basis; is prepared plans, the owners of the accounting basis. 2. the renovation budget basis 1, decoration design. Including diagrams, interior decoration plane zoning plan and decoration of plane zoning plan, local detail drawing, such as the room in the kitchen, living room, bedroom, etc.; 2, decorative effects; 3, decoration project construction plan. III. the renovation budget methodology and steps 1, collecting the information; 2, familiar with drawing content, master the design intent; 3, read the quota calculation of quantities,; 4, form fixed or unit table, calculate the direct costs. IV. composition of the renovation costs of home decoration in the total cost should be the principal material fees + auxiliary materials fee + artificial fee + design fee + fee + taxes. Material of main body is decorated according to the construction area in the construction or individual project involves production and semi-finished materials such as wood flooring, tiles, sanitary wares, lamps, metal, etc. 5. impact of decoration budget four factors material price is quoted based on material quality is also one of the factors determining prices, the quality fruit, works good relatively expensive, on the contrary, it is relatively inexpensive; the other is brand, brand, reputation, good material than the unknown small plants to expensive. Technology affects the final quote refers to the level of construction workers of the construction and production levels. In the material the same cases, workers ' skills directly affects the quality of the decoration. Trade, skilled workers, the asking price natural high. There is construction management to more complex construction costs, the types of cross-cutting jobs, processes the order to guarantee the construction quality is critical. Please have the expertise to manage construction of formal decoration company is going to spend more. Decoration company qualification is the factor of excellent decoration companies have offices, design department, engineering supervision Department, material support center, Finance Department, audit, etc. These require certain costs, these costs will be reflected in the price. Decoration budget 5 a trap: trap a la low price of a single item such as a landlord know flooring, ceramic tiles, current price, but he did not necessarily understand the floor tile installation, labor costs, and so he took the floor, and tile price cut down, but in labour costs, had a loss. Solution: see decoration-quote, don't just stare at a solid single price for an item, but rather to comprehensive manual, loss, mechanical, and other costs of the project, if you find a special low price, you should review the other items in the price. Trap 2 missing out hard decoration on the main materials of the decoration was deliberately omitted to quote some of the main materials of the owners was such an overall price reasonable quotation attracted brisk signing, but in the next renovation process owners will provide decoration companies in these malicious forgotten but constantly to foreign treasuries. Solution: when a gentleman first villain, according to design drawings, required in the contract or agreement decoration clearly all main Member, and marked with the purchaser is a decoration companies or owners themselves. Usually it is easier to be left out of the main materials of the wall, ceiling, and other materials used in the corner. Trap three fuzzy selected main materials of quality, level, specifications, this is not standard decoration companies more commonly used trick, although write clear need some material, indicate the quantity of material need, but did not explain exactly what quality selection, what brand and what sizes of materials. Solution: ask decoration companies explicitly material quality, levels, specifications and models, and other parameters in the budget table marked out for later installation, use the reference. Traps 4 tamper materials measurement unit owners rarely pay attention to the units on the quote, don't know much about different unit means that offer great digital deviation. For example, make a shoe Cabinet, looks like a reasonable way, in fact on shoe size not specified, then leave the fitting to the abuse.
Solution: in many projects or recommendations in accordance with the actual area, such as wardrobes, Shoe cabinet, as little as possible to the "items", so that the error occurred during the decoration. Traps five construction craft vague light look at numbers, do not see the text description is most owners in view quote often committed fault, always feel that a number of errors would cause losses, but certainly not obscured by the type description, this is not the case. Many construction projects as long as the leakage through working procedure, it may cause trouble. Solution: learn a little decoration tips, learn more about the interior decoration of the engineering construction craft standard, regularly to understand process Coverly, such a barrier. It is best to hire a qualified, professional and construction personnel and stable services for its own decoration company. How to schedule a good budget? 1, auditing, drawing is accurate should how to objectively review decoration budget? in the examination of the estimates before, you should audit good drawings. A complete, detailed and accurate drawings is a budget price, as the quote is by drawing specific area, length dimensions, use of materials and technology, etc., drawings are not accurate, the budget is certainly not accurate. 2, the project is complete to the approved budget of all projects are complete, is not to do the things listed in the budget statement, there are no reporting of a door or leave out the kitchen wall tile and bedroom tijuexian. Missing items to the on-site construction time, sure, we'd like to do this you have to do to increase the project's procedures, to increase the unexpected expense. 3. units of measurement results to watch out for the budgetary implications in the budget of the unit of measurement. In the furniture production, the decoration is the difference between a relatively large. For example, big wardrobe or bookcases, some companies use lengthens the rice, this time with square meters, will note, because often the M2 's furniture no matter how high the width, the number is multiplied by the price per square metre to calculate, and lengthens the rice is a calculation of furniture height limits. 4. drawings and budget size should be consistent with reference to the drawings check budget books in a specific number of engineering projects. For example, by drawing on the dimensions to calculate the area of the tile is 60m2, budget books should be around data calculation 60m2 should be fairly strict and accurate, if calculated according to the drawing area is 60m2, budget books are 65m2, that was obviously incorrectPoor. For some price high decoration projects tend to be significantly different from a thousand dollars of money. 5, materials and process descriptions to specific decoration companies should tell decoration family, quoted the price is what the material, what technology. If you see such a quote: "wall Dorrance 38 Yuan/m2" this is clearly not specific enough. "Dorrance" is a wall paint brand, including a lot of product, interior wall paint, exterior wall paint, interior wall paint is divided into several categories. Each paint also has a variety of colors. 6. special conditions of the special budget in home construction process, inevitably there will be some special construction, or decoration decoration family made some special decoration requirements. At this point, the decoration of the fee will not be able to calculate the normal price. Such as water, circuit construction: budget on waterways, circuit at the start of the reconstruction costs is difficult to accurately calculate, usually to a small part of the received in advance, and then by the completion of the actual number of settlement.

No comments:

Post a Comment