【 Weak current College 】 new acceptance and approval tool


New House decoration ready to begin on a new House acceptance, new skills, and accepting what need acceptance tool which, following the acceptance of my new House on a new house in the process of acceptance of skills, and acceptance of the use of tools to share to you.


First of all: all moved on, it is recommended that everyone in the third or fourth day all moved.
Need a tool with acceptance and use:
A plastic closet--for acceptance into the water pipe
A little hammer--for acceptance of house walls and floors are empty drum
A feeler gauge--for measuring the width of the crack
A 5 m tape measure--for measuring the height of the House
A multimeter---for testing various strong electrical socket and light current class is unblocked
A calculator---for calculations
A illustrators--for signature
A broom to clean the Interior and health
A small stool and some newspapers, plastic belt, packaging lines--for a long time, you can rest and closed water pipeline in advance.

Acceptance House time: usually lasts 2-3 hours, it is recommended that morning 8: 30 to 2: 30 p.m. or.
All moved process: to view the data portion of the property sector, respectively, have the following information needs to be examined:
The housing of the residential warranty on--can be taken away
The residential manual "--can be taken away
The final acceptance for filing form D, area measurement table
Pipeline distribution completion chart (water, strong electric, electronic, structural)--can be taken away
If developers ready, typically 10 minutes to when you have finished viewing the information.

The following is the acceptance of the House

Read the information, the Basic can take your acceptance tool to acceptance of new houses.
New acceptance techniques: for the first delivery of some property costs and related expenses, which will push you to the property delivered to communicate with them, new House after the acceptance, delivery costs, take the keys from the property Department, here are some things to note that the keys respectively should have floor apartment keys, enter keys, mail box keys, water meters, electricity meters (if there are other remote meter reading), and so few. Then you can go with the property staff House. (Remember to pick those acceptance tool, OH)

Here are the new acceptance in important matters:

1) detailed acceptance of new quality, including doors and Windows, balcony and there are no cracking phenomenon; (balcony crack dangerous large)
【 Acceptance skills 】 new acceptance before due to the new House empty time is longer, the doors and Windows of the track, there will be some dust and building rubbish, so must not be very impulsive, use brute force with sliding doors and Windows, a sense of feeling blocked, carefully look after you with a broom clean you can watch.

2) checks whether the wall roughness, seepage, is there a crack.
【 Acceptance skills 】 new acceptance in particular view some wall if there is no trace, especially some Gables, kitchen health top, wall, etc, and if so, be sure to investigate as soon as possible.

3) examine the ground, carefully check the ground have no shell cracking.
【 Acceptance skills 】 new acceptance as free drum, it is important to entrust to accompany the property officer as soon as possible repair, decoration can easily penetrated floor, impede the neighborhood. More than 2-3 items available inspection tools small hammer and a feeler gauge.

4) electricity and gas flow situation and correctly used.
【 Acceptance skills 】 open faucet leak sealing, whenever possible, let the water run larger 7、acute, a look at the water pressure, try drainage speed. (General new House will be equipped with a simple tap to the landlord). Multimeter measuring individual ELV is clear.

5) close the new acceptance, by gate check individual opening is in full control of all branch lines.
【 Acceptance skills 】 new acceptance into the water when the first basin of water, then to all the water Department of irrigation, basin water, bathtub, toilet water, kitchen and sanitation and balcony floor drain, etc, basically every next nozzle should be poured into two basin water around, should hear the sound of swishing and no stagnant water. After doing this, confirm that no problem, to highlight the launching them as soon as possible (e.g. basin water, bathtub, toilet water supply) get a plastic bag cover a nozzle, and then to bundle real leakage, etc., and as the water need to plug it (remember to keep a position can be filled out).

6) acceptance of new ground water conditions in flushing toilet water, a brief discussion on the line (about high 2cm). Then go downstairs owners in 24 hours after viewing their home closet Wei of smallpox.
【 Acceptance skills 】 in acceptance of all of these local new home run out of water, then turn on the meter, that the water meter digital, recorded, and to record the meter numbers.

7) check the contract on facilities, equipment, etc., are there left, brand, quantity is matched;
【 Acceptance skills 】: usually in this context, it should be no big problem, but are you sure you want to carefully verified.

8) measurement at high levels of buildings.
【 Acceptance skills 】: 5 m measuring tape, sampling data source locations and specific data, it is best to water meters, electricity meters high numbers, floor, toilet, bathtub, hang from the length and width, shower room dimensions, ceiling height are recorded in a small book, while some acceptance House data and issues written in property companies on paper.

Finally, check out the work, if not a problem, then go on to money; if there are problems with the property staff determine solution and solve date, see resolve all moved, are affected by the results if need to intervene.