Saturday, January 1, 2011

【 Weak current College 】 property renovation regulations


According to the Ministry of the interior decoration and management measures "; in the spirit of strengthening community decoration engineering management and oversight to protect the security of buildings, the extension of the useful life of property, maintenance of large numbers of owners of normal life and work order. Administrative provisions for the decoration are as follows: first, the decoration approval procedure 1, declare the following documents should be prepared before the housing title certificate, non-owners need to produce owners authorization; hire of decoration construction team qualification, Project Director ID, a photocopy of business license, and so on; in the case of simple decoration, must be issued by the owners, the decoration guarantee can not provide such information as qualifications; construction plan, construction plans, elevations, water and electricity construction drawings, etc. 2. provide information on licensing examination, by an owner or owners of the authorized person to fill out the application form and decoration works. 3. the decoration project application form and construction materials handed over management engineering technical personnel approved by the Management Office Director approval agreed decoration. 4, with the consent and approval, decoration holders and management service sign the doucument of decoration. 5, decoration and margin management services: management services consist of the construction unit of $ 2 per square metre to pay to the Office; the deposit consists of the construction unit of $ 10 per square metre to the management service payment (decoration Chun workers and experience your qualified after three months, without any problems, the margin left by the project may refund); 6, management service out of the decoration work orders "," decorating responsibility licensing law, construction unit for construction personnel after the temporary passes on to construction. Second, the decoration and 1, the following acts are prohibited without the original design unit or with the appropriate qualification of design changes in the submitted design, architectural and load-bearing structures; 2, there would be no room for waterproof requirements or balcony into the bathroom and the kitchen; 3, expanding the original doors and Windows on the load-bearing walls, demolition of connections balcony slabs, concrete wall; 4, damaged housing the original energy-saving facilities reduce energy; 5, building, structure or structures; 6, altering residential facades, in non-load-bearing walls open the door and window; 7, other effects of building structure and use the security acts. Third, the decoration construction management 1, owners or decoration construction team must accept the management service on decoration engineering supervision and management; 2, construction time: small and medium-sized works for 30 days, 60 days in larger projects, such as the required extension, to renew the formalities and press 5 Yuan/day equivalent to the decoration and management services; construction time for the day: morning 8: 00-12: 00, 14: 30-19: 00, holidays don't allow construction (Office building). 3, decoration works are completed, construction team leader should report to the management and owners, management and owners of common decoration engineering conduct acceptance; 4, decoration construction team if there is a breach of Community provisions, the Administration has the right to make substantial processing, owners should support it.

No comments:

Post a Comment