Monday, January 3, 2011
【 Weak current College 】 indoor decoration management service agreement
Indoor decoration management service agreement
Owner: (hereinafter referred to as party a party b),
B ___ ___ Home: building, room owners ________ ___ Mr/Miss (hereinafter b)
To strengthen the management of the decoration engineering to ensure project quality and proper functioning of the community in order that the parties agreed to sign this agreement.
First, the party is committed to compliance with the interior decoration management approach ", and other relevant policies and regulations, the owners use the Convention, the preliminary estate services agreement, and agree to the provisions of the above file.
Second, the second party to conduct the respective titles under the interior decoration, interior decoration and management measures "requires the party claiming and receiving the decoration license attached to a single law, into the apartment back.
3. party b shall not be refused and the Party of the law of residential interior decoration activities of supervision and inspection.
Fourth, to minimize the impact to other owners of rest, the two sides agreed on the Community internal decoration of the daily working time is 8: 00-11: 30, 13: 30-19: 00; Saturday, Sunday and legal holidays does not conduct audio work.
5. party b shall select an appropriate qualification of decoration, decoration and renovation construction personnel have certificates, b to its own delegate such officer to verify the holder of the conditions of undocumented not delegate and the owner the right to manage the personnel to access community must go through the pass.
6. decoration b str pay 20 thousand decoration, decoration on completion of the deposit by the Party of the engineering staff verification no breach of party a full refund of the deposit (non-interest bearing), such as in the renovation process appear to violate the agreement, the interior decoration management approach ", and other relevant policies and regulations, the owners use the Convention, the preliminary estate services agreement, the owner the right to postpone retirement deposit until the second party will recover irregular decoration section.
7. party b to undertake not to exceed the scope of the license single decoration decoration, not occupied or temporary occupation of public areas.
8. party b is responsible for the fire safety of construction sites, should be required is equipped with fire extinguishers, smoke, is strictly prohibited without authorization is strictly prohibited to use the open fire. Cutting welding cost to open flame should be made to the buyer when the Security Department, Engineering Department to use open fire, approved and implemented guardians and fire prevention measures to be carried out. At the same time non-fire party b shall not be in violation with the fire hydrant, RMB 50 Yuan each time.
IX. the renovation of the waste must be bagged, party b shall be responsible for timely cleaning to a designated dump point. Removal shall not refuse escaping when it should be noted in the hallway, elevator and roads. If any loose clean should be timely.
Party a is responsible for specifying garbage pilling up of decoration removal work.
10. party b in the community to carry yellow sand, cement, lime, must be bagged the aisle, staircases, pavement, as any loose, should promptly wash cleanly.
11, high-rise elevator is guest elevators, b transportation of construction materials and bulk goods shall use, unauthorized use of the owner the right to stop, and shall compensate the loss of b.
12, the second party decoration, on new and changed in various kinds of pipelines, facilities and equipment is necessary to pay attention to security, not tampered interior walls, bathrooms, kitchens and the walls and floors, roof decking, railing, the original line, otherwise damage by party b is responsible for compensation.
13. in order to maintain community environment and orderly, clean and tidy, b and b a delegate construction personnel access to various types of vehicles (including mopeds) should be subject to the property management Department of management. For a random stop, misplaces vehicle management service has the right to be left in the Qing dynasty from losses in the process, the owner does not assume responsibility.
14. as the majority of owners in the community, to carry goods to leave the safety of the community, the registration reporting system, go to hold a community out of the card, and after a party a service confirmation. B and b delegate decoration construction personnel must meet.
15, b-removal tools, materials, garbage, and so shall not affect the customers into and out of Office and shall wear and damage to marble, granite, Batten, stainless steel, elevators, glass, lighting, wall, and other public facilities. Contravention of the above requirements, shall be punished by the corresponding compensation.
16. the Community shall not adopt any way closed balcony (including the use of frameless glass); the small high-rise building owners may not install solar facilities; not closed or changed, no balcony gutter unclosed storm drain; air-conditioning design must be in the original location or to a designated location.
17, b should be responsible for safety at work in construction, strengthen the construction personnel security education. As a result of the construction personnel violation caused accidents, party b shall bear full responsibility for the loss caused the owner shall be liable for compensation.
18. date of completion of the construction site, b or b the principal ought to take a serious look at the construction site, ensure that the scene clean to prevent leaving a fire hazard, waste should be cleaned up, do not block the channel, and the electrical device power down. For flammable materials, shall be deposited work to do ahead of time, fixed counter is responsible for the amount deposited, articles should not be excessive, construction has been completed, the remaining articles shall be removed from the site.
19, b construction damage to community facilities and buildings shall be responsible for compensation. Use the toilets in accordance with the licensing provisions, must guarantee the toilet clean, is strictly prohibited to toilet, Doo in dumping mortar water, debris, such as a sewer blockage, b party shall promptly dredging and bear all the losses caused.
20. in the performance of this agreement in the event of dispute, the two sides negotiated settlement or to property management and administration departments apply for mediation, negotiation or mediation, Arbitration Commission for arbitration in jiaxing city, you can also appeal to the Supreme People's Court.
21, there are not two separate consultations or supplementary agreements. This agreement, in duplicate, one copy for each party to enter into force on signature.
甲方_____________乙方(业主)_____________
日期_____________日期_____________
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment