Wednesday, January 5, 2011

【 Weak current College 】 decoration five acceptance?


Home decoration is generally divided into five areas acceptance (water, electricity, tile, wood, oil). And to national acceptance and construction contract quality acceptance criteria on engineering aspects for acceptance, as owners of non-professional acceptance should note the following:

1. water: water tank, washstand, sanitary equipment, pipes, heating etc.

See: sink, wash basin, sanitary installation is smooth, strong, straight; upper and lower water pipeline is straight, fasteners are installed, there is no leak connectors and leakages.

2. power: the power cord (socket, switch, the lamp), TV, telephone.

See: power cable is using GB copper, general lighting and sockets use 2.5 square lines; kitchen with 4 square line, if the power cord is stranded wires will be processed before the next in the solder switch socket; TV and telephone signal cables and power cords to keep a certain distance (not less than 250mm) lamp installation to use metal hanging point, after completion of the test you want one by one.

Third, the tile: ceramic tiles (wet paste, dry plaster), stone (wet paste, dry hanging).

See: before a scheduled preselection process, the specification of materials into categories, in separate room or a plane to make bricks, every align individual Alice Horn material as cutting material use, so that you can use lower quality materials with good results.

4. wood: doors and Windows, ceiling, wall, vinyl, flooring, heating cover.

See: select the wood must be elected baking ingredients, this will avoid future deformation; wood side to static surface coating fire anticorrosive material before use, blockboard to choose quality materials with high environmental protection. Large ceiling, wainscots per square meter of not less than eight fixed, suspended ceiling to use metal hanging point, door and window production in order to use some of the material to prevent deformation. Floor-leveling of wood to larger (not less than 6 x 6)

5. oil: paint (boiled oils, mixed oil), coatings, paperhanging, soft package.

See: decoration of surface treatment is the most critical, the paint must be using high quality materials, coating or spraying must be done well before the surface treatment, mixing up the wood surface, plain child ash polishing flat after spraying paint, wall of wall paint and then brushing before, be sure to use Primer (to cut off the wall and the acid-base reaction finish) to prevent the wall surface discoloration.