【 Weak current College 】 2009 cost examination the cost of basic knowledge of simulation examination paper



I. single answer question:
(1) to design phase is focused on the entire process engineering cost control in its construction drawing design phase the possibility of influencing the project cost is: [D]
A10-15%、B20-35%C、75-95%、D5-35%、E5-75%
(2) primary cost Member candidates to a unit can engage in many million following their professional level commensurate with the cost of business: [C]
A500、 B5000、 C1500、 D3500
(3) in addition to other costs of engineering construction land use fees and the next production-related fees also include: [C]
A production preparation costs, B compensation for land acquisition and migration, C and project-related expenses, D equipment and utensils acquisition costs
(4) in accordance with the relevant provisions of the preliminary design of the total budget approved by the relevant bodies, to control the proposed project cost of [C]
A minimum limit, the ultimate limit, B C ceiling, D specified limit
(5) construction cost consulting enterprises must be legally obtained the engineering cost Consulting Enterprise Certificate "to engage in project cost consulting activities. Their qualification standards regardless of category b enterprises registered investor cost engineer in number and capital contribution shall not be less than [D]
A、30、60、B、20、50、C、10、40、D、60、60
(6) known to complete a process to set the basic labor quota be days, Super labor 12.5 distance labor 0.8, secondary employment 1.05, artificial picture difference coefficients used 12% that aim budget fixed consumption of artificial shadow days should be how many days? [A]
A、16.072B、14.572C、14.000D、17.22
(7) items Arabic numerals with 12-bit encoding, which (B) the order for partial project.
A, a, 2 b, C, 5, six, seven and eight D 10 to 12-bit
(8) in the understanding of the concept of quantities, first of all it should be noted that quantities are available by [C].
A project cost intermediary, B project tendering Agency, C the tenderer, bidder D
(9) [A] Yes to complete the project, the project took place in the pre-construction and construction technology, life, security, non-engineering entities project.
A, B, ad-hoc measures project work item C, part of the project, D, other projects
(10) the investment decision-making process can be further divided into the planning phase, the project proposal stage, feasibility study phase, review stage. Due to the different stages of the condition and the information obtained is different, thus investment estimation accuracy is different, in normal circumstances a feasibility study on the phase of investment estimation error rate in [C]
± 30% A, B, C, ± 20% ± 10% D, ± 10%
(11) the quantities leak or design changes lead to a new list item, its corresponding integrated unit price by the contractor, the (b) Recognizing that as a basis for settlement.
A, B, cost advisory bodies constructer C, cost management departments D, bidders
(12) the implementation of quantities should be [A] contract, Contracting Parties must contract private terms of contract risk profile and risk cost calculation.
A fixed price, fixed price B, C, cost plus fee D, adjustable price
(13) the scope of the agreed risk, [C] should not be included in the contractor's risks, price adjustment clauses in should be private.
A, B, unpredictability of natural disasters C, design changes and construction conditions change D. policy adjustment
(14) the contract may require the contractor to complete the contract outside employment, etc., required by the Contracting Parties after the signature of the authorized site engineer, costs in accordance with (D) valuation.
A. sub-project project B. measures project c. other project D. sporadic projects
(15) specification digging foundations earthwork, press design diagram size to (C) calculation.
A base area, multiplied by the digging depth B, pit bottom area multiplied by digging depth
C, basic bedding substrate area multiplied by digging depth D, base layer bottom area plus face multiplied by digging depth
Second, multiple choice answer question:
(1) construction project is the construction of new or renovation of existing fixed assets. His work includes: [ACD]
A construction project preparation, construction, equipment acquisition, B production repair, construction machines, buys C survey design, testing and commissioning, D construction and installation, completed and commissioned
(2) construction investment into productive construction projects [ABDE]:
A, transportation projects, B, energy projects, C, material and cultural needs of the project, D, E industrial engineering projects, irrigation projects, etc.,
(3) the construction of the administrative departments under the reasonable construction organization plan, in accordance with the normal working conditions, the production of a measured unit engineering qualifying product required [ABC] the average consumption of society, known as the consumption is fixed.
A, B, C of artificial materials, machinery and rent fee D, E, profit
(4) consulting industry as an industry, technological progress and the results of the socio-economic development. In the national industry classification is [B] and [CE] social function.
A, B, primary industry and tertiary industry, C, services, and boot function, D, orientation and guiding function, E, contact function
(5) our quantity unit price method of construction and installation the project cost by direct project costs, indirect costs, profits and taxes. Direct project costs including [ABCE]
A, labor and material costs, B, C construction mechanical royalties, and temporary facilities and on-site management of costs, D, E, enterprise management fees and other direct costs
(6) temporary facilities costs include [ACDE], etc.
A, temporary facilities erection, B, lighting facilities of erection, C, temporary facilities maintenance, D, temporary facilities for demolishing, E, amortization
(7) construction fixed include various kinds of scale, you can follow the different principles and approaches to scientific classification. Its purpose in accordance with applicable can be divided into [ABCD], etc.
A, project rating, B, construction and installation engineering fees fixed, C, equipment installation engineering norms, utensils, fixed, D, engineering-building other costs fixed E, construction fixed
(8) "construction projects resilience detailed list counts the price specification features include which aspects [ABCD]
A, mandatory, B, C, competitive, rationality and practicality D, E, versatility
(9) the construction of the administrative departments under the reasonable construction organization plan, in accordance with the normal working conditions, the production of a measured unit engineering qualifying product required (ABC), the average consumption of society, known as the consumption is fixed.
A, B, C of artificial materials, machinery and rent fee D, E, profit
(10) non-competitive cost (A, C, D, E, a).
A, civilized construction site security measures fee B, temporary facilities, secondary cartage
C, D engineering norms determination fee, safety production supervision fee E, labor insurance
(11) the quantities leak or design changes lead to a new list item, its corresponding integrated unit price by the contractor, the (b) Recognizing that as a basis for settlement.
A, B, cost advisory bodies constructer C, cost management departments D, bidders
(12) the implementation of quantities should be [A] contract, Contracting Parties must contract private terms of contract risk profile and risk cost calculation.
A fixed price, fixed price B, C, cost plus fee D, adjustable price
(13) the scope of the agreed risk, [C] should not be included in the contractor's risks, price adjustment clauses in should be private.
A, B, unpredictability of natural disasters C, design changes and construction conditions change D. policy adjustment
(14) the contract may require the contractor to complete the contract outside employment, etc., required by the Contracting Parties after the signature of the authorized site engineer, costs in accordance with (D) valuation.
A. sub-project project B. measures project c. other project D. sporadic projects
(15) specification digging foundations earthwork, press design diagram size to (C) calculation.
A base area, multiplied by the digging depth B, pit bottom area multiplied by digging depth
C, basic bedding substrate area multiplied by digging depth D, base layer bottom area plus face multiplied by digging depth
Second, multiple choice answer question:
(1) construction project is the construction of new or renovation of existing fixed assets. His work includes: [ACD]
A construction project preparation, construction, equipment acquisition, B production repair, construction machines, buys C survey design, testing and commissioning, D construction and installation, completed and commissioned
(2) construction investment into productive construction projects [ABDE]:
A, transportation projects, B, energy projects, C, material and cultural needs of the project, D, E industrial engineering projects, irrigation projects, etc.,
(3) the construction of the administrative departments under the reasonable construction organization plan, in accordance with the normal working conditions, the production of a measured unit engineering qualifying product required [ABC] the average consumption of society, known as the consumption is fixed.
A, B, C of artificial materials, machinery and rent fee D, E, profit
(4) consulting industry as an industry, technological progress and the results of the socio-economic development. In the national industry classification is [B] and [CE] social function.
A, B, primary industry and tertiary industry, C, services, and boot function, D, orientation and guiding function, E, contact function
(5) our quantity unit price method of construction and installation the project cost by direct project costs, indirect costs, profits and taxes. Direct project costs including [ABCE]
A, labor and material costs, B, C construction mechanical royalties, and temporary facilities and on-site management of costs, D, E, enterprise management fees and other direct costs
(6) temporary facilities costs include [ACDE], etc.
A, temporary facilities erection, B, lighting facilities of erection, C, temporary facilities maintenance, D, temporary facilities for demolishing, E, amortization
(7) construction fixed include various kinds of scale, you can follow the different principles and approaches to scientific classification. Its purpose in accordance with applicable can be divided into [ABCD], etc.
A, project rating, B, construction and installation engineering fees fixed, C, equipment installation engineering norms, utensils, fixed, D, engineering-building other costs fixed E, construction fixed
(8) "construction projects resilience detailed list counts the price specification features include which aspects [ABCD]
A, mandatory, B, C, competitive, rationality and practicality D, E, versatility
> (9) the construction of the administrative departments under the reasonable construction organization plan, in accordance with the normal working conditions, the production of a measured unit engineering qualifying product required (ABC), the average consumption of society, known as the consumption is fixed.
A, B, C of artificial materials, machinery and rent fee D, E, profit
(10) non-competitive cost (A, C, D, E, a).
A, civilized construction site security measures fee B, temporary facilities, secondary cartage
C, D engineering norms determination fee, safety production supervision fee E, labor insurance
(11) the quantities should be in unified format. The cover page, [A] [B], sub-project of quantities, measures project list, a list of other projects, sporadic projects list, [D].
A. General description notes B. C. sub-project quantities comprehensive price analysis table D. a. for material table, E, comprehensive fee calculation sheet
(12), integrated unit price should cover the artificial fee, material fee, machinery, [BD], taking into account the risk factors.
A, materials purchase fee B, C, D profit taxes, management fees and other fees for project E
(13) project cost management is the [ABC].
A reasonable determination of project cost, B, C of effective control of the construction cost, enhance investment returns D, construction and installation the project construction cost E, other expenses
(14) when a sub-project of quantities project engineering change, it measures the cost of the project in the [BD] project amount should be adjusted.
A mechanical artificial D. C. B. template scaffold E, materials
(15) of the legal form in China including: [BCDE]
A, the competent authorities of file B, administrative regulations, C, D, of the Constitution, laws forbid E, administrative regulations
(16) the provisions of contract law: the parties conclude a contract with [E] form, its written form includes: [BCD]
A, 5 B, C, letters, contracts, and data messages, D E, III
(17) the guarantee Act People's Republic of China provides warranty forms are: [ACD]
A, B, C written guarantee, mortgage and pledge D, indwelling and deposit E, oral
(18) the construction of underground obstructions affecting construction is found, the contractor shall in hours what form notification letting people [CD].
4 A, B, C, 8 D message, writing what form E, casual
(19) the construction contract claims and dispute handling method [ACD]
A, B, intermediary negotiation negotiations C, invited intermediaries mediation
D, apply for arbitration to the arbitration body E, Executive award
(20) the current construction cost management of consciousness [AB].
A, B, innovative service C, D, conscious management consciousness E, guiding ideology