Tuesday, December 21, 2010

【 Weak current College 】 weak construction project management



Electronic construction project management is an important work of construction units. In accordance with the ISO9001 quality standard requirements, including a number of areas, more notably, construction management, technical management and quality management.
I. construction management

Construction is a comprehensive and strong management lies in its role of coordination and organization, and other professional management content, its main elements are as follows:

1. the construction of progress management construction progress management decided the whole construction period construction personnel, equipment supply and electronic engineering and civil engineering, decoration engineering combined with time, usually must be through the establishment of the project schedule to check and manage. Establishment of current construction schedule is under construction on the basis of the order, the order of its construction mainly includes the following stages, namely the construction and installation diagram design (deepening secondary design), pipeline construction, equipment (purchase) acceptance, equipment installation, commissioning and initial launch and acceptance.

2. the construction construction interface management interface to manage the weak electricity system engineering construction, equipment installation and repair project construction in its construction content scale surface of Division and coordination, in particular the intelligent building management systems and electromechanical equipment and independent subsystem interface interface a lot, the General in charge of works through various subsystems will open schedule to manage, create a file report system, everything in writing record, modify, or harmonization measures, etc.

3. construction of organization management reasonable arrangements for the entire period of the current system of construction project managers and technical staff, installation and commissioning engineer's size and the staff entrance time, avoid unnecessary labor and waste, increased labor costs. It management needs and construction progress management closely integrated, structured organizations powerful construction team, the quality and quantity to finish this stage of construction tasks.

4. construction site safety management, security is a paramount, strict follow-up, implementation and enforcement of the building Act, People's Republic of China People's Republic of China Environmental Protection Act, the People's Republic of China Labour Code, the construction safety management regulations, laws, regulations, and the construction safety check with the relevant provisions of regulations and measures.

Second, engineering and technology management

1. the technical standards and norms to the weak electricity system project management system for design, delivery, and installation link check and control the relevant standards and norms that make the whole management is in control.

2. the installation process management power engineering is a technical and usability are strong, to do the entire electronic engineering technology management, primarily to seize the various construction stage installation equipment and technical conditions and technical requirements for the installation process. Field engineers and technicians to strict checks that every encounter with the specifications and design documents do not match or the construction process to do the modifications that you want to record, for the last system debugging and opened a whole, to establish technical management files and data.

3. the technical documentation management power system engineering technology is a project at all stages of the implementation of a common basis. These folders include the weak electronic system of construction drawings, design notes, and related technical standards, product manuals, various subsystems of debugging outline, acceptance, weak integration system functional requirements and acceptance criteria, and so on, these technical file has to be a scientific management system, in order to be able to keep the project managers with a complete, correct the technical file, thus establishing technical file send and receive, copy, modify, approval to justice, custody, borrowing and confidentiality, and other rules and regulations of a series of cases, implementing effective scientific management.

3. quality management

Project quality management is building weak electricity engineering units for all work performed comprehensive reflection of the quality system, ISO9001 system to run through the weak electricity system throughout the project implementation process to really grasp the following quality links:

1. the construction drawings of normalization and cartographic quality standards;

2. pipeline construction quality checks and supervision;

3. review the wiring specifications and quality requirements;

4. wiring construction of quality inspection and supervision;

5. the on-site equipment or front-end equipment of quality inspection and supervision;

6. the master device of quality inspection and supervision;

7. intelligent electronic system for monitoring the fill in the parameter setting table and floor on;

8. debugging outline of auditing and implementation and supervision;

9. system run time parameter statistics and quality analysis;

10. system acceptance procedures and methods;

11. system acceptance and quality standards;

12. system operation and management of regulatory requirements;

13. the system of maintenance and repair of specifications and requirements;

14. inspection of records and system of operation, etc.

In the above guarantee system for high-quality links to the exact make quality control, quality inspection and quality assessment.