【 Weak current College 】 repair construction steps
I. approaching readiness
1 room for testing. On walls, floor and roof of smoothness and the layout of the drainage pipe.
2. electricity, gas, free checking and record the delivery signature owners (agent).
3, material preparation. Column material inventory, and distribution center Coordinator.
4, personnel scheduling. Determine the construction personnel, and specifically in charge of the site.
5, workshop and site layout. Display construction drawings, construction production requirements.
2. repair construction process
1. demolition
Removal: If a structural to clearance.
Handling: demolition waste and scrap materials.
Clean: clean the construction site.
2, water, gas, engineering
A hot and cold water discharges and water supply equipment installation.
B, power supply, electrical equipment, telecommunications, lighting each line emission, determine the installation location, the line box of cartridges of switch socket location installation.
C, gas pipelines and gas emissions from the installation of the apparatus.
3, brick construction
A, brick, wall, door and window
B, paint (cement dust and paper reinforced lime).
C, drying racks installed.
4, metal construction
A, aluminum Windows and doors, plastic doors and Windows installation.
B, anti-theft doors and Windows, awning installed (this community to prohibit the installation of security doors and Windows, awning).
C, drying racks installed.
5, carpentry works
The making of A, wood products: doors and Windows, siding, corner line, ceiling panel, kitchenware, bathroom fixtures, etc.
B, soft sleeper furniture production (wardrobe, shelves a cupboard, TV, shoe boxes, etc.).
C, laying the floor, tijuexian (Board).
D, glass mosaics loading.
6, veneer works
Paperhanging wall, roof and paper (cloth), making soft decoration.
7, paint engineering
A, group of embedded walls, top PuTTY, paint.
B, wooden products awarded with PuTTY, paint.
C, flooring, tijuexian (Board) paint.
D, latex paint for wall top brush.
8, installation engineering
A, electrical switches, outlets, panel mounting, lighting installation.
B, door locks, door bell.
C, sanitary ware sets and hardware accessories (taps, SOAP, towel racks, trays, bathtub handrail, mirror glass).
-Arrange for D, range hood, exhaust fan, water heater.
Third, completion of total acceptance
1, booth cleaning, decoration of the room by room-clean to clean up.
2. in accordance with the relevant decoration acceptance criteria for acceptance (rectification, and then carry out the inspection).
3. provide pipeline circuit diagram, the equipment product warranty card.
4, according to the actual decoration engineering conduct total settlement of invoices.
5, decoration engineering credit engineering warranty card.
4. after service showcase
Setting up home decorating project archives, arrange for regular users are linked to access.