Thursday, December 23, 2010
【 Weak current College 】 pavement flooring construction specification standards
Pavement flooring is very important in home decoration, workers are not specifications pavement, we lay people is hard to understand, so here are some specifications on the pavement, as well as pavement technology essentials for your reference. 1. pavement flooring specifications pavement flooring environment requires ceiling and inner wall construction of decoration. Doors and Windows and glass all healthy. Indoor wall has drilled well loaded under the pavement, skirting the wooden, wood die spacing and position accuracy. Wood flooring solid surfacing method of operation program: basic cleanup → elastic cord, leveling → drilling and installation of embedded parts → install gross floor, leveling, planing flat → nail for flooring, leveling, planing flat → nail skirting → planed, sanded → paint. Wood floor empty shop law procedures: grassroots cleanup → elastic line → drilling installation pre surfacing pieces → ground moisture-proof, waterproof processing → pavement wood joist → pad insulation layer → elastic cord, bound gross floor → leveling, planing flat → nail wood floor, leveling, planing flat → install skirting → planed, sanded → paint. Wood floor pavement quality requirements: surface planed worn, no obvious planing marks, Russia stubble, Burr, clear. Floor surfacing in the right direction, slot, slot tight, header location staggered, surface clean. Clear oil layer color uniform, the surface is smooth, without Alice drum, and skirting joints close when no empty drum sound. According to the specification for the program to reach the quality of pavement, qualified requirements. 2. wood floor construction techniques to pavement is a professional wood and strong construction projects. Wood floor surfacing operations by standardizing procedures, should also pay attention to the following specific issues: (1) all wood flooring to the construction and installation of the scene, should be stored indoors unpacking a week or more, the wood floor and room temperature, the humidity can be adapted to the pavement. (2) wood floor pavement before a select, culling has obvious quality defects of non-conforming product. The color pattern consistent pavement in the same room, there is a slight quality shortcomings but does not affect the use, can be placed in the bed, furniture, Cabinet, the same room at the bottom of the thickness must be consistent. The time of purchase should be based on actual paving area increased by 10 of loss once purchase is complete. (3) the keel laying flooring should use pine, fir tree species difficult to deformation, wood joist, skirting the back should be treated with preservatives. (4) the pavement of solid wood flooring should avoid heavy rain, rain and other weather conditions. Construction best able to maintain indoor temperature and humidity. (5) in the same room of wood flooring finish should be a pavement, to have plenty of accessories, and to timely job finished product protection, strict precautions against oil pollution-break, juice, etc. Installation of extrusion of the gum liquid to time off.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment