【 Weak current College 】 party engineers how to audit diagram
Some people may say a Tribunal adjudicator figure, figure Centre Party a own figure? yes, party a party b should audit diagram. On the one hand, the Tribunal may not figure Center very carefully, the Tribunal will review all of the drawing the problem; on the other hand, the figure Center audit diagram and party a engineer of figure focus is different.
In the design of the plot, the drawings required to review map center to review drawings, while also sending planning, fire fighting, civil defense, lightning protection and other relevant departments and approve (in some places to get water, electricity sector, the Tribunal). These departments review mainly audit drawings meets the relevant requirements, specifications, contracts, etc. The Review Tribunal Map Center, mostly for drawings would violate various mandatory provisions, meets the requirements of the project is located in seismic, Typhoon requirements, environmental protection, energy-saving requirements, and is designed to meet the structural safety requirements. It can be said that these departments or units of figure, its review of the relevance of the center of gravity and construction is not strong.
In addition to these mandatory audit plans, and construction of related parties such as the owner, construction, supervision would or should also review the construction drawings. And the more carefully reviewed. Usually, the owner, construction, supervision of party audit diagram adds a drawing of small errors and doubts are listed, the requirements for the design, add or corrected. The owner, construction, supervision of party because it represents the different actors, the focus will be different. As the party is concerned about the use of function, if it is used for the sales, will focus on the effects that affect the appearance or feel of the details of the buyer.
Party a best Tribunal figure is to party a project from a marketing perspective will help sales detail marketing requirements and accurately communicated to design party. Including water pipeline, subtle and beautiful, also including the impact of doors and Windows open, causing a visual sensation of sorts. In addition, we must pay attention to whether or not to cause users such as collision occurred when walking.
After the design drawings, party a party b engineer examination plan focuses on:
1. the design is by marketing requirements or recommendations for design of a particular detail requirements.
2. the design of the omission of any such as some necessary to drain lines, lighting Sockets lines, beginning, socket, box, etc. Gas, also weak should not be overlooked.
3. For those prone to defects of the node, if the added structure construction, construction reinforcement measures.
4. For the marketing of some special mouldings, across the Board, flower stand, Wells road, design is considered adequate factor of safety.
5. The blueprint design including node structure if there is some uncertainty, likely to understand the differences, if there is a clear approach to design and detail drawing.
6. For some less refinement (selling) location design, exterior design is avoided.
Of course, now the owner of the drawings is variable, Ricoh or optimization, mostly in order to save costs, such a practice I beg to differ. Party a Tribunal figure found issues best in construction contract before the conclusion of the review and revision, so as to avoid controversy in construction so that effect progress.