【 Weak current College 】 network room interior design focus


Computer room project set building, electrical, installation, network, and many other professional technology. Computer room environment must meet the computer and other computer and electronic equipment and staff on temperature, humidity, cleanliness, magnetic fields, fire, security, power quality, lightning protection and grounding, etc. Computer room design and construction of a direct relationship to the engine room computer system is stable and reliable operation, can ensure the smooth flow of all kinds of information and communications, can protect protection security.
Computer room projects including decoration engineering, electric work, air conditioning, wiring works, fire engineering, grounding lightning protection, security and other parts. Room building in fact confined to the size and importance, economic capacity, and other factors. In our network of small and medium-sized enterprises should be suited to the construction of the engine room.
Room layout requirements
1. room location to help staff turnover and equipment handling. Engine room should include: host room, basic workstation, the first aid room, auxiliary room category II and III of the secondary room etc.
(1) master room
The computer hosts, network equipment, the operations console and main external devices (drives, tape drives, communication controllers, monitors, etc.) of the installation site.
(2) basic workplace
For complete information handling procedures and the necessary technical job. Including: the Terminal room, data recording, communication machine room, recorded on magnetic media library, has recorded paper media library, laser printer, wide printers, plotters, etc.
(3) the first aid room
Directly to the computer hardware maintenance, software research service premises. Including: hardware maintenance, software analysis to modify room, instrumentation room, spare parts library, random library, not recorded magnetic media library, undocumented paper media library, hardware, personnel office, software, staff offices, hands-on ready room and external user Studio, etc.
(4) the second category of auxiliary room
In order to ensure the electronic computer room to reach the various process environment requires the necessary public professional and technical room. Including: the transformer Chamber, high-voltage distribution Chamber, uninterruptible power supply unit, battery room, generator room, air conditioner, fire-fighting equipment, and security control room, etc.
(5) the third category of auxiliary room
For life, health and other purposes, a secondary section. Including: changing rooms, lounge, bathroom, etc.
2. equipment room all equipment should have sufficient installation space, including computer hosts, network-connected devices, etc. Rack and rear left at least 1.2m space for equipment installation, commissioning and maintenance.
3. engine room height requirements for beam minimum height is not lower than 3m case rack too high, is not conducive to equipment installation, maintenance.
4. engine room floor to be able to afford enough weight, especially in the upstairs rooms. For heavier equipment (such as the DC battery) to frame the following mat channel to distribute gravity.
5. engine room roof, walls, doors, Windows, floors should not fall off, no dust, decorative materials should be non-combustible materials, all installation cabling hardware, walls and ceilings should be fire-retardant paint coating. Window and door seal well to prevent dust, harmful gas or other substances causing metal particles intrusive contact bad or short circuit, the impact of computers and other devices for work performance. Wall, ceiling should be coated with dust-proof paint.
6. in the engine room environment must maintain a certain degree of humidity and temperature, and good ventilation. To this end, the room should be equipped with professional air conditioning and fan, to meet the computer and other equipment Typ on temperature, humidity requirements. The device should be kept at room temperature between 10 ° c to 25 ° c, relative humidity should remain 60% to 80%.
7. engine room should have antistatic measures. Room anti-static floor should be laid. Floor installation grounding copper tape.
8. engine room should have a reliable work grounding, lightning protection, earthing. Good grounding is a necessary condition for the normal operation of the device while it is anti-static, anti-jamming, lightning strike, the Elimination of an important means of induction electricity, should be given adequate attention. Antistatic and mine is the room of the main disaster prevention.
9. the device should use UPS uninterruptible power supply, to prevent power outages caused by network traffic outages, host is not a normal shutdown. UPS should provide not less than 2 hours of reserve power supply capability. UPS power size should be under the power of network devices, and has 20-30% of the allowance. Device power device with overvoltage, overcurrent protection function is to prevent the adverse effects on the device and impact.
10. the room should have the fire prevention measures. The engine room must be equipped with appropriate fire-fighting equipment; the engine room the different voltage socket should be clearly marked; no storage of flammable, explosive and other dangerous goods and corrosive substances.