【 Weak current College 】 how rapid acceptance of decoration


During the Olympic Games in Beijing in March for vehicles requiring makes many manufacturers difficult to ensure that the delivery time, and the decoration of the construction workers would also stop working during this period. Many owners in order to catch the Olympic Games before the finish, basically decorated 5-7 month began to rush. But 5-7 months since the air temperature is high, hot, with summer rain, House decoration quality becomes a lot of people worried about the issue. For this particular phase of the renovation, the owners to focus on check acceptance due to high temperature humidity and Miss work due to shoddy work not up to the decoration.

1. wood products foaming deformation

In the humid summer, decoration is moisture-proof. If the moisture-proof working process is not good, to the dry season, wood, sheet metal easily deformation, warping, woodworking acceptance in summer decoration of the more important.

Focus on acceptance: door sets, water-absorbing moisture is generally reflected in the bottom, a paint bubbling, swell and deformation. If the door set just bloated, and the gap between the door frame larger, glass plastic re-sealable. If the door sets of deformation, the normal switch door effect, it is necessary to replace the door. If this is the paint surface bubbles, you need to Polish door sets, and brushed.

Other acceptance: carpentry is straight, flat surface, no drum or breaking. Door switch is normal operation, turn on the light, when no abnormal sound; fixed cabinet Ministry received wall should generally be no gaps. Liner and the Panel must be bonded.

Tip: wood products in the rainy season, rain, bubble deformation appears. On the window sill if use of wood products, carefully check the water through the wood or the wall between the seamless into the window below.

2. floor joist loose

In pavement flooring, gap should be compared with the previous arrangements more closely in order to avoid gaps in the temperature decreases to affect beauty become larger.

Focus on acceptance: acceptance when walking up and down on the floor, especially against the wall and door parts to pay more attention to the acceptance, found sound parts, to repeat, to determine the specific location of the sound, well marked. When this happens, you can request removal of resurfacing. Sound parts mainly to keel firmly fixed, some repair construction units used to without drying of keel construction, on the surface is dry, but not dry. High moisture content in wood and keel natural drying process volume will decrease, resulting in a loose.

Tip: the wood flooring should first look at the color of the floor. If the color difference is too big, directly affect beauty, you can request a transfer. The floor is deformed, warping, acceptance is 2 m long ruler, on the floor, formation should not be greater than 3 mm.

3. ceramic tile hollowing discoloration

Focus inspection: check to see whether free tiles major drum, if too many empty drum tiles, after long-term use will gradually be stepped up, affecting both good-looking and impact. Empty drum major of tiles because tile cement mortar too much water, and in a few days, cement mortar, water evaporation, and floor tiles following mortar will collapse, brick appears empty drum.

Check whether the color of tiles. If you find a tile, ceramic tile color quality is poor, axis surface too thin, improper construction method is also important factors. Possible in the construction of the water in the immersion tiles is faulty or the tile using a cement mortar is not good, became larger wall tiles to update immediately.

Other acceptance: acceptance depends on whether the brick surface is not flat and tilt phenomenon, brick surface is broken, the correct orientation of ceramic tile, brick and waist line location is correct, the local air drum shall not exceed the total amount of 5%.

Tip: when paving the rainy season as much as possible to retain a smaller gap, since it itself has some expansion in the dry season can shrink.

4. the wall surface crack mouldy

Large temperature difference between summer and winter indoors, if not carefully decorated, prone to gap, etc.

Focus on acceptance: summer regular touch paint dry slowly on the wet weather will mouldy. Wall mouldy comes from two aspects: first, the Foundation damp mouldy walls, the second anointed PuTTY without waiting for PuTTY dry brush paints cause mildew. Cracks in the walls of Beijing is a normal phenomenon, mainly because there are indoor insulation Board and insulating plate between the seams will produce plate joints crack, in the wall slotted wiring cable trunking up ash shrinkage cracks appear later, plastering scraping PuTTY uneven stress cracks appeared.

Other acceptance: wall latex paint is no empty drum, blistering, cracking phenomenon. General latex paint is peeling, leakage brush, thoroughly bathed in red, large no flow pendant, cockle, requires consistent surface color, no clear brush marks.

Tip: repair construction wall cracks is one of the most common phenomenon, probably just decoration also look at seasonal climate change is particularly evident when, this requires maintenance and repair decoration company later.

Focus on acceptance: furniture carefully to see whether there are pan-white fog phenomenon, this situation is due to the wet paint, wood surface in wet weather will condense a layer of water vapor. Then brushed, water vapor is wrapped in the film, so that the wood surface muddy. If the rain brush varnish, may appear white.

Other acceptance: acceptance of furniture paint mixing surface is formed blistering saturated, ensure that you do not, no cracks and paint thickness to balanced, consistent color. Wooden furniture of the paint quality usually look for chromatic aberration and stream falling phenomenon, the surface should be clear and smooth, not pungent smell.

Tip: paint construction is advised to avoid paint on rainy days, if not the rain, in particular tidal brushed in the environment, but also to use desiccant dehumidification or air conditioner, pumped out the moisture in the air. Wall finished immediately do a wall cabinet will create cabinets moisture.

6. make edgePrevention of pollution

When the temperature and humidity increases, decoration material contamination. In summer, construction, construction site coming out of VOC (volatile toxic compounds) more than in the winter, in summer the House decoration pollution is more serious, decoration of harmful gas emission is a long-term process, even some pollution sources in fifteen years are constantly available. Benzene is half a year on dissemination, but completely inside the glue of formaldehyde emitted may be more than ten years.

Focus on acceptance: be sure to carefully check whether do edge sealing sheet, all edge are required, so that the edge lines closed dissociation is not easy to volatilize out of formaldehyde. Custom furniture often needs to be done, and layer laminated plate inside the hole drilling is to disseminate the formaldehyde, should provide the location of the drilling "cap" closed the hole.

Tip: in the decoration is inevitably there will be some toxic gas, decoration finished be sure to note many window ventilation each day. The decoration, the landlord can ask the professional bodies on indoor environment for testing. In the event of non-compliance of environmental decoration, decoration companies can't perform project delivery and acceptance.

Inspection detail:

Drainage pipe should be unblocked

Toilet and hot water switch, taps and shower installation is fair, flexible and convenient to use. View the current of water was shipped with water festival door size. Floor drain have blocked. Drainage pipe should be clear, no down-slope, no plug, no leakage, floor drain grates should be slightly below the ground. Acceptance is repeated after discharge water filled with, to see whether the smooth water drainage.