Saturday, December 18, 2010
【 Weak current College 】 full renovation contract sample
Contracting Party (the party): __________________________________ contractors (b): __________________________________ contracts under the People's Republic of China, the consumer protection act People's Republic of China, the People's Republic of China price, the Beijing city contract terms: supervision Ordinance, the Beijing building market regulations, the Ministry of the family indoor decoration management pilot scheme, as well as other relevant laws and regulations, combined with the specific circumstances of the present project, a and b both parties in equal, voluntary, consensus reached on the basis of an agreement to jointly. The first project profiles 1. party a decorative Housing Department legally resident. _____ B to the city by the Administrative Department for industry and Commerce approved and registered, and to hold municipal construction Committee awarded the construction enterprise certificate "of the enterprise. 2. decoration construction place: ________ district (County) _______________ road, lane (village) ____ ____ ____ ___ floor, room no.. 3. housing structure: __________ ______ _____ hall room type room, construction area of _____ ___________ m2. 4. decoration: (see annex I contents of the decoration construction "). 5. contract: __________________ (contractor Pack materials, cleaning contractor, part of the contract). 6. the total purchase price: $ _________ $ uppercase (RMB): ________________ where: material fee: _____________________, artificial fee: __________________ management fee: ________________________________, design fees: _______ junk clearance freight: ____________________, taxes (3.41%): ______ other costs: ___________________________ both conventions, such as changing the content, change the material of construction, this part of the project is excluded by subsection. 7. duration: _________ _______ ________ day month year started, to ________ _______ _______ day of the month in the completion of the ________ days duration. The second material supply of the Convention: 1. party a to provide the material: (see annex II to the party a to provide material, device, table "). Party a is responsible for purchasing and supply of materials, equipment, should meet the design requirements of qualified products, and timely supply to the site, the a and b should handle the transfer procedures. If the party a party b materials, equipment, quality problems or size difference, should be promptly submitted to the party a party b, party a party b is still represents the use of, the resulting loss of responsibility by the project owner. The Party of the supply of materials arrive on the scene, the party responsible for the custody, custody of losses, caused by improper by party b is responsible for compensation. 2. party a purchase and supply of decorative materials, equipment, shall apply to this contract require residential decoration, non-consent by the party a party b shall not be used for any other purposes. If a party breaches this provision should be misappropriated materials, equipment, the price of double compensation to the owner. 3. b materials: (see annex III of the primary materials-quote "). B supply of materials, equipment, the owner should be to the site, such as the acceptance does not conform to the design and construction requirements or specifications, should be prohibited. If used, the losses caused to the project by party b is responsible for. The third article on project quality and acceptance of the Convention: 1. the project implementation DBJ08-62-97 the residential construction or decoration engineering technical specification ", DB31/T30-1999 the residential decoration acceptance criteria, and municipal construction executive authorities of the other local standards, acceptance criteria of quality assessment. 2. this project by providing design, _________ square construction drawings in triplicate ______ copies.
Labels:
[:]
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment