Tuesday, December 21, 2010

【 Weak current College 】 engineering design qualification ranking criteria


1. General provisions
㈠ under the construction works and design Management Ordinance and the construction engineering survey and design units, quality management regulations ", for the development of the Socialist market economy and the industry need for reform of management system, combined with engineering design industry technical characteristics of the work to develop this standard (engineering design sector see table 1).
㈡ engineering design covers the industry construction the project's main works and necessary supporting projects (including factory-owned station, road, rail, pipeline and auxiliary buildings are all supporting projects) as well as with the main project, supporting projects related to technology, civil engineering, construction, environmental protection, fire protection, safety, health, energy, etc.
㈢ engineering design industry qualification ranking criteria are approved engineering design engineering industry qualification.
㈣ engineering design industry qualification set a, b, c three levels, with the exception of construction projects, municipal, irrigation and road and other industries the engineer design category c qualification can independently access engineering design market, other industry engineering design category c qualification set objects are only for internal belongs to non-independent corporate design units.
Second, the classification standards
㈠ category
⒈ qualifications and reputation
⑴ have independent legal personality and 15 years and above in the engineering design qualifications, is the backbone of the industry, and project management capacity in the same industry at home and abroad enjoy a good reputation.
⑵ independently take over industry large engineering design for a period of not less than three, and has been put into operation. Its engineering design project quality and efficiency.
⑶ units have good social credibility and there is a corresponding economic strength, the business and the registered capital of not less than 600 million Yuan.
⒉ technical force
⑴ the strong technical force, professional equipped, reasonable, unit of dedicated technical experts for a period of not less than 80 (for staff). Has also assumed the 2 major engineering design tasks.
⑵ units in charge of major technology (or chief engineer) should be more than 12 years of experience, and presided over the design or participated in 2 (hosted at least 1 item) and above the large project design of senior engineer.
⑶ in units dedicated technical experts:
Hosting over 2 or more industry-leading technology for large projects or leading professional design of senior engineer (or registered engineer) not less than 10 people;
Registered architect not less than 2 people (one for less than 1 personnel);
Registered engineer (structural) not less than 4 people (which shall not exceed 1 for personnel);
Hosted or attended 2 more industry large projects of the public professional design of senior engineer (or registered engineer) not less than 20 people.
⑷ industry-led technology or leading specialty and other professional equipment requirements in annex 2.
⒊ technical level
⑴ owns and engineering design-related patents, know-how, technology package (bundle) of not less than 1 item, and computer software development capabilities, and achieves the domestic advanced basic requirements, and application in engineering design, remarkable results.
⑵ can use of patents, know-how, technology package (package), new technology, independent engineering design.
⑶ has the country (territory) external cooperation design or bear country (territory), engineering and project management of technological capabilities.
⒋ equipment and application level
⑴ has advanced and complete technical equipment, has reached the national construction administration departments provided for grade-a design unit equipment and application level assessment criteria:
Construction drawing CAD plot rate of 100 per cent;
Feasibility studies, project design CAD technology for up to 90%;
Optimization (optimization) of CAD technology for up to 90%;
File and document storage introduction of computer management;
Application engineering project management software, the progressive realization of the project management of computer design project;
There is a better computer network management.
⑵ has a fixed place of work, dedicated technical experts per capita area of not less than 12 square meters.
⒌ management level
⑴ has established a design project management, professional management-based management system, the implementation of design quality, progress, and cost control.
⑵ enterprise management organization structure, standard system, quality system, and can achieve dynamic management during guarantee, should the ISO9001 quality system certification.
⒍ business results
⑴ won nearly four provincial-level and above excellent design, excellent computer software, excellent standard design awards three level and above shall be not less than three (which may contain and engineering design related provincial and ministerial level and above of science and technology progress Award 2).
⑵ nearly 15 years, editor-in-Chief of 2 or 3 items and edited over more States, industry, local construction standards, specifications, fixed, standard design.
㈡ class b
⒈ qualifications and reputation
⑴ have independent legal personality and 10 years and above in engineering design qualifications and skills in project management capabilities.
⑵ independently take over industry medium and higher engineering design for a period of not less than three, and has been put into operation. And has been put into operation. Its engineering design project quality, efficiency is good.
⑶ units have good social credibility and there is a certain economic strength, the registration capital units over a period of not less than 200 million Yuan.
⒉ technical force
⑴ technique strength strong, professional equipped, reasonable. Unit of dedicated technical experts for a period of not less than 30 persons (for staff). Have to shoulder 2 industry medium engineering design tasks.
⑵ units in charge of technical (or chief engineer) should have 10 years and above design and hosting, participated in 2 (hosted at least 1 item) and over medium industry project design of senior engineer.
⑶ in units dedicated technical experts:
Hosting over 2 or more industry-leading technology for medium-sized projects or leading professional design of senior engineer (or registered engineer) not less than 5 persons;
Registered architect not less than one person (non-retiree doctor);
Registered engineer (structural) not less than 2 people (one for personnel shall not exceed 1 person);
Hosted or attended 2 more medium-sized projects in the public professional design of senior engineer (or registered engineer) not less than 10 people.
⑷ industry-led technology or leading specialty and other professional equipment requirements in annex 2.
⒊ technical level
⑴ can adopt domestic and foreign advanced technology, independent engineering design.
⑵ has the technical capacity for project management.
⑶ have computer capabilities to meet the basic development to improve-and achieved results.
⒋ equipment and application level
⑴ the necessary technical equipment, the construction of the State administrative departments of the provisions of the technical equipment and staff design unit application level assessment standards:
Construction drawing CAD plot rate of 100 per cent;
Feasibility studies, project design CAD technology for up to 80%;
Optimization (optimization) the application of CAD technology; up to 80%
File and document storage introduction of computer management;
Can be widely used computer engineering design and design management;
There is a better computer network management.
⑵ has a fixed place of work, dedicated technical experts per capita area of not less than 10 square meters.
⒌ management level
⑴ the establishment of a design project management-focused management system, the implementation of design quality, progress, and cost control.
⑵ sound quality system and technology, management, personnel, financial, archives, and other management systems.
⒍ business results
Participated in national, industry, local construction standards, specifications, fixed and standard design for the production of or trade in business-building efforts.
㈢ c
⒈ qualifications and reputation
⑴ have independent legal personality and 6 years and above in engineering design qualifications and skills in project management capabilities.
⑵ independently take over industry small and higher engineering design for a period of not less than three, and has been put into operation. Its engineering design project quality, efficiency is good.
⑶ Unit has certain social reputation and have the necessary economic strength, the registration capital units not less than 80 million Yuan.
⒉ technical force
⑴ unit of dedicated technical experts not less than 15 people. There are certain technical force, professional equipped. There are also bear 2 industry small engineering design tasks.
⑵ units in charge of technical (or chief engineer) should be more than 10 years of experience, and presided over the design or participated in 2 and above industry small engineering design of senior engineer.
⑶ in units dedicated technical experts:
Hosting over 2 or more industry-leading technology for small projects or leading professional design engineers (or registered engineer) not less than 4 people;
Level 2 registered architect in person (or registered architect not less than one person);
Level 2 registered engineer (structural) not less than 4 people (or registered engineer (structural) not less than 2 people, of which not less than 1 for personnel);
Hosted or attended 2 more industry small projects of common professional design engineers (or a, level 2 registered engineer) not less than 5 people.
⑷ industry-led technology or leading specialty and other professional equipment requirements in annex 2.
⒊ technical level
⑴ can adopt advanced technology, independent engineering design.
⑵ has the technical capacity for project management.
⒋ equipment and application level
⑴ the necessary technical equipment, achieve the following targets:
Construction drawing CAD plot ratio 50%;
File and document management for computers;
Able to apply computer engineering design and design management.
⑵ has a fixed place of work, dedicated technical experts per capita area of not less than 10 square meters.
⒌ management level
⑴ establish design project management-focused management system.
⑵ quality system can effectively run a sound technical, management, personnel, financial, archives, and other management systems.
3. undertake business scope
Degree in engineering and design industry qualification units allow bear's business scope:
Category design organizations undertake corresponding industry construction project design scope and area is not restricted.
Category b projects design unit to undertake corresponding industry of small and medium-sized construction projects of engineering design tasks (all industries construction project design scale Division see schedule 2), undertake engineering design task region is unlimited.
Category c design unit to undertake corresponding sectors of small construction projects of engineering design tasks (business design scale Division of construction projects in annex 2). Undertake engineering design shall be limited to the provinces, autonomous regions and municipalities within the administrative area.
Have a, grade b qualification units, can bear the appropriate advisory business, except in special, can also undertake corresponding engineering design special qualification in business.
4. supplementary provisions
Since the promulgation of this standard ㈠ date of execution.
㈡ This standard to interpret by Ministry of construction.
C special qualifications in engineering design-Standard
1. General provisions
㈠ under the construction works and design Management Ordinance and the construction engineering survey and design units, quality management regulations ", for the development of the Socialist market economy and the industry need for reform of management system, combined with the special design features of the technical work to develop this standard.
Special qualification ㈡ engineering design classification standard is approved engineering unit project construction design qualification level.
㈢ engineering design and the establishment of the special qualifications required by the relevant industry sector or authorized by the Association and approved by the Ministry of construction.
㈣ engineering design of a special qualification ranking criteria according to the professional development needs settings level.
Second, the classification standards
㈠ category
⒈ qualifications and reputation
⑴ have independent legal personality and 5 years and above special engineering qualifications and skills in project management capabilities.
⑵ independently take over special project design for a period of not less than three, has been completed, the project design quality and efficiency.
⑶ Unit has certain social reputation and have the necessary economic strength, the registration capital of not less than 100 million Yuan.
⒉ technical force
There are certain technical force, professional equipped with reasonable, at the same time take 2 major specialized engineering design capability. Each of the major professional full-time technicians are equipped with not less than three people, including at least one host or participated in 2 major special project design business.
⒊ technical level
⑴ has primary professional or related field of patents, know-how, technology package (package), not less than 2.
⑵ with special application in engineering design, and the computer's ability to achieve significant results.
⑶ has the country (territory), cooperative or independent country (territory), special project design and project management of technological capabilities.
⒋ equipment and application level
⑴ the necessary technical equipment, basic reach national construction administration departments require class a design unit equipment and application level assessment criteria:
Construction drawing CAD plot rate of 100 per cent;
Feasibility studies, project design CAD technology for up to 90%;
Optimization (optimization) of CAD technology for up to 90%;
File and document management for computers;
To apply project management software, the progressive realization of the project design project of computer management.
⑵ has a fixed place of work, dedicated technical experts per capita area of not less than 10 square meters.
⒌ management level
⑴ has established a design project management, professional management-based management system, the implementation of design quality, progress, and cost control.
⑵ enterprise management organization structure, standard system, the quality management system is effective, and can achieve dynamic management during guarantee.
㈡ class b
⒈ qualifications and reputation
⑴ have independent legal personality and 3 years and above special engineering qualifications and skills in project management capabilities.
⑵ independently take over special project design for a period of not less than 2, and has been completed, the project design quality, the efficiency is good.
⑶ units have good social credibility and there is a certain economic strength, the business and the registered capital of not less than 50 million RMB.
⒉ technical force
There are certain technical force, professional equipped with reasonable, at the same time take 2 medium special engineering design capability. Each of the major professional full-time technicians are equipped with not less than 2 people, of which at least one host or participated in 2 major special project design business.
⒊ technical level
⑴ has primary industry or related field of patents, know-how, technology package (package), not less than 2.
⑵ with special application in engineering design, and the computer's ability to achieve results.
⒋ equipment and application level
⑴ the necessary technical equipment, the construction of a basic up national administrative departments of the provisions of the technical equipment and staff design unit application level assessment standards:
Construction drawing CAD plot rate of 100 per cent;
Feasibility studies, project design CAD technology reached 80 per cent;
Optimization (optimization) the application of CAD technology; up to 80%
File and document management for computers;
Able to apply computer engineering design and design management.
⑵ has a fixed place of work, dedicated technical experts per capita area of not less than 10 square meters.
⒌ management level
⑴ the establishment of a design project management-focused management system, the implementation of design quality, progress, and cost control.
⑵ has a sound quality management system and technology, management, personnel, financial, archives, and other management systems.
3. undertake business scope
Get engineering design special qualification certificates of units affordable large, medium and small specialized engineering design projects, not subject to restrictions; access to engineering design special grade b qualification certificate of units affordable to small and medium-sized special engineering projects is not subject to restrictions.
Holders of special engineering design, category b qualification units can undertake corresponding consulting business.
4. supplementary provisions
Since the promulgation of this standard ㈠ date of execution.
㈡ This standard to interpret by Ministry of construction.
Note: the "dedicated technical experts" refers to the following people:
⑴ registered architect, registered engineer (structural) and in the countries of other professional registered engineers registered engineer after the system;
⑵ the cost of registration;
⑶ obtained the high title of technical personnel;
⑷Engaged in the engineering design practice 10 years and have achieved the intermediate professional titles of technical staff.
Schedule 1: project design sector table (brief)
Table 2: the industry professional engineering design and basic is equipped with table construction projects design scale Division table (slightly)

No comments:

Post a Comment