Saturday, December 18, 2010
【 Weak current College 】 completion chart establishment
Completion of the figure is building installation completed archives in the most important part is the construction finished in the main documents of materials and engineering completion approval required, at the completion of the figure is building real, are the works of maintenance, management, renovation and expansion.
1. completion chart type
2. change in the construction of the blueprints on line method
3. in the bottom figure on the modified requirements
4. a redraw completion chart
5. a paper folding method
1. completion chart type
1. use construction blueprints to redraw the completion graph
2. in the bottom figure modified on completion chart
3. the completion graph redrawn
Three types of as-built drawings submitted drawings, blueprints.
2. change in the construction of the blueprints on line method
Specific to redraw the method to view, change the location, scope and complexity and the extent of the actual circumstances, common some words drawn as follows:
1. dimensions, door and window type, equipment type, model, type and quantity, reinforcing the note notes numbers, words, symbols of cancellation or change, you can map it to a number, text, symbols, etc., in contrast with staves. And modify the site-wide margin indicate modifications based (using special stamp annotated).
2. curtain walls, doors and Windows, steel, light fixtures, equipment, etc., available as climbing up the fork.
3. in building a site increases the curtain walls, doors and Windows, lighting, equipment, steel, etc., should be in the actual location on the map with formal mapping maps and modify.
4. If you increase or change content in the original location sketch is not clear, you should place this figure (margin) as needed accurate clear up painted detail drawing and adding to the contents of the other, and to modify parts of the bounding box office leads to blank for modifications. If this figure is no position can be drawn at another sketch with sulfuric acid paper, complement to blueprint drawings attached in this profession, it should be noted that, in the modify location and complements the onion to indicate the change on the basis of, the other drawn complement to a figure, figure number, as a single sheet of as-built drawings. Be drawn using the drawing space painted detail drawing method, but it should be noted that where the change relates to the building plans, charts are to be drawn.
5. a device configuration location, lighting, switch models, etc. caused by changes in the representation of the change; walls, slabs, internal and external decoration, and other changes should be drawn on the original diagram.
6. a diagram of a site change is large, or in the original location to redraw the difficulties, or be drawn after the messy, you can use the following approach to sketch:
(1) picture detail drawing to sketch
General practice to mark the original figure should modify parts of the range, and then to modify drawings on painted this modified parts of detail drawing and image into paint range and be drawn detail drawing Department indicate the modifications.
(2) modify the complements the other painted
If the original drawings no margin can be changed to paint parts draw a sulfuric acid paper complements the sun into a blueprint, as part of completion of drawings, fill in the drawings, as a single sheet of as-built drawings. Specific practices: in the original drawings on draw modify scope and to modify the basis and the "see a figure (figure number)" and detail drawing name; in the complements the figure number and name, is indicated in the description of a graph (figure number) certain parts of the complements, and indicate the modifications.
(3) individual blueprints needed to redraw the completion chart
If a drawing modification cannot be modified on the original blueprint, you need to repaint the diagram of the as-built drawings. This figure should be national cartographic standards and drawing completion chart provides mapping.
7. all pipeline construction completion chart must have wide pipeline corner points and crossing point and the main valve point sets the technical elements of measurement points, and indicate the individual measuring point accurate technical elements of various data values and measuring point number.
8. Figure appointments review, design changes, single, single, etc. should be linked to the project by article indicate the modified drawing number.
9. modification of note issue
(1) the original construction drawing directory must be stamped with the completion of the stamp, as-built drawings archive, where there is a void, supplemental, additional or modified drawings, construction plans to be in the same directory where the database is marked clearly. Void drawings on carrying out the directory, add the drawings in the directory listed on the map name, figure number.
(2) press the construction drawing without any change of drawings, in the original construction drawing completed stamp on stamp, as-built drawings.
(3) If a construction drawing design due to changes in the large, flat to redraw the modify figure should be to modify the map place of the original image, the image no longer archived.
(4) any negotiation figure as completion chart, you must press the as-built drawings of the standard necessary.
(5) a negotiation may involve two or two above drawings, a local change is likely to cause system changes, where the drawings and parts should be modified in accordance with the regulations, cannot only be one, not the second.
(6) do not allow the negotiation of the drawings attached in unchanged or attached to the completed diagram as amended, is not allowed to copy the contents of the discussions in the blueprint as modified. Any modifications shall be painted in the blueprint or used as a complement to a report in the drawings.
(7) a drawing, in accordance with the requirements that need to be redrawn as-built drawings should be drawing completion chart requires mapping.
(8) considerations when changing figure:
Word, line and ink usage requirements;
Word: Word using font, the font size to the original figure in font size, no mistake, don't, grass.
Line: use drawing tools, Freehand.
Ink: use black ink. Strictly forbidden to use a ballpoint pen, pencil and non-blackColor ink.
Construction of the blueprints of provisions:
Instead, redraw the as-built drawings of construction of the blueprints for the new figure, drawings contrast to clear in order to adapt to technical requirements of microfilm, etc. Where the old figure, contrast bad drawings shall not be used as a sketch map instead.
Modify the method:
Construction of the blueprints to redraw shall not use a knife to scrape, subsidies and other methods to modify, revised completion drawings shall be pollution, smudge, coverage, etc.
Modify the description of the content and shall not exceed the original box.
3. in the bottom figure on the modified requirements
On the second floor map to modify the contents of the negotiations, are commonly used for completion of the mapping method.
1. on the second floor plans, requirements in paper format on a modified pro forma table to be modified in content and negotiating a change of content. You can modify the contents briefly annotated in a note for a table, you should not see the original negotiations that knowledge to modify the contents of the site and Basic.
2. modify the description of the parts of the language used is not clear, you can also use the thin solid line in Figure Drawing and modify the scope.
3. on a revised second base map or blueprint, as built drawings, to second base map or blueprint for the completion of a stamp on stamp. No changes to the second floor plans go do completion chart also stamped with the stamp of completion.
4. a redraw completion chart
Project completion, the project actually redraw the completion of the figure, while the volume of work, but cannot guarantee the quality. Back to the drawing system requires original content integrity and correct, modify content can also be accurate and true reflection on the as-built drawings. Drawing completion chart according to the provisions and requirements of the architectural drawing, you must reference the original working drawings and diagrams of the unified professional and at the bottom right corner of the diagram rendering completion chart figure check.
5. a paper folding method
1. General requirements
(1) according to the drawings, before folding cutting line clipping neatly, the drawing format is required to comply with the requirements;
(2) surface folded inwards, into accordion bellows;
(3) fold format size should be 4 # drawing basic dimensions (297mmX210mm) as standard;
(4) icon and completed stamp exposed.
2. folding method
4 # drawings not collapse, 3 # drawings collapsed, 1 # 0 # drawings collapse, drawings of collapse.
3. tool use
Drawings collapse, ready for a slightly less than 4 # drawing dimension (normally 292mmX205mm) template. Collapse, the first drawings on the provisions of the location, and then follow the collapse method of numbering order collapsed (first horizontal, vertical).