【 Weak current College 】 need to guard against all moved traps before renovation


First, all moved when you question what?

We all moved to note is based on contract, see developers are fulfilled its contractual obligations, housing facilities, equipment meets, brochures, promotional content is, the existence of the housing area, and other aspects of the error, or you can hire a lawyer and engineering and technical personnel to visit with you.

Second, best all moved process

1. the primary material verification.

2. receive (three cards of the book).

3. pay the remaining above the limit.

4. pick up keys and signed the book of residential key received.

5. do a comprehensive acceptance.

6. acceptance of questions, suggestions or solutions.

7. the developer and landlord and reach a written agreement.

8. in accordance with the agreement to solve the housing problem, can not be resolved within 15 days, the Parties shall agree on the solutions and the deadline agreed in writing. 9. signing the admission intern ".

3. How do I check the housing

Mainly from the following areas:

(A) check that there is no crack houses. As long as it is checking the top of the ground and, if there is a crack, in General, and the room parallel to crack the beam, although quality issues, but the basic risk does not exist, the patch will not prevent use. If cracks and corners at a 45 degree angle or vertical and horizontal beam, the housing settlement, there is a structural problem. In addition, see the load-bearing walls have cracks, crevices and wear down through the wall into the room behind the existence of danger, for this type of housing, the buyer must not have a chance.

(Ii) the check there for housing. Although the professional housing inclination required specialized equipment, but buyers use Visual approach from a different angle, distance around close-up observation can basically discovered the problem. You can use string bolt on the roof with a heavy object, the wall down to the base, from all around to check the tilt.

(Iii) there is no leakage check housing. Buyers should pay attention to see housing ground and top water leakage, it is necessary to examine whether the housing wall color, blistering, peeling, off ash, these are signs of leakage. You should also see the kitchen, bathroom and balcony at the top and pipeline interface leakage.

(Iv) examine the wall surface, ground. For the decoration has been done rough House room, check whether the flat wall surface, does not have a significant fluctuations; ground should be clean, not dusting. Check the wall have no lime "bust". Thickets beating "burglary", you will find large areas of loose and falling off, and so on quality issues. Check the kitchen, the bathroom wall tile, brick masonry of eligibility can not have cracks, not hollow, it must be built.

(5) check the bathroom, the kitchen floor is done processing. See water is smooth and unhindered platoon to the outlet.

(Vi) inspection doors and Windows. Doors and Windows of the appropriateness of compactness, opening closed is smooth. The edge of the door frame, window frames and so vulnerable to the impact force is dense, should not have the slit.