【 Weak current College 】 decoration budget price variance analysis


Decoration, we will find a lot of decoration materials budget price comparison on the renovation cost has always been a top concern for consumers. At present there are a lot of home decoration company, the budget price differences are often very large. Many consumers have experienced such a puzzle: in the same home market, the same is with an area of 120 square meters of new House, a company's budget quotation is 4.8 million and next to another company budget quote 3.2 million, almost the same decoration, the difference in price was $ on. Decoration offer why is there such a big difference?

Industry experts pointed out that, in the home budget price management, under the influence of regional differences, the current state and there is no uniform standard, some of the quotes home decoration market only lists the price guide for consumers. But because of the renovation project and project how much is affecting the entire decoration offer direct factors, decoration company size, quality, rating, management system, it has caused a budget price differences. Overall, the cost of the decoration should include: design, main member fees, ancillary materials, time, management fees and taxes. But need to remind consumers that do not merely decoration companies to get the initial budgetary quote to select home businesses. Because until now there is indeed still using consumer decoration company is not a layman, playing on the quote "flower work" phenomenon.

Then, review the budget offer decoration companies from which aspects? note verifying the decoration of the "addition". Some home company although in the initial budget offer is very low, but signed with consumers, home improvement contracts tend to have a lot of additional items, some even designers deliberately lost, missing items. As originally and designers talk about the good content, however there is no indication in the contract, while consumers have not noticed. So even though the contract when the price is not high, but wait until project completion, increased and more, spending increases. The most common "add content" including: before the signing of the contract and not the Clearwater decoration company, the circuit of price, not distinct dark tube, but in the final settlement of all is the most expensive; or in the Shui, circuit reconstruction, intends to extend the water, the length of the circuit pipe, consumers are therefore subject to additional losses.

Note to verify the decoration engineering "subtraction". Consumers generally carpenters, bricklayers, oil workers, etc. these "can be seen, touched," comparison of conventional project, supervision is tight, but for concealed work and some details are poorly understood. Above the water, water-proof and leak-proof construction, strong electric power transformation, air-conditioning piping works done in the short term, it was difficult to see the differences and finding many constructors in this issue. And if some company requires interior walls to brush 3 x wall paint, but the construction team has only brush 1 again, apparently did not see any difference, but actually reduces technology standard, temporarily is no problem, over time, the order will be exposed.

Note to verify the decoration budget quote of "partial calculation". These companies do more formal the surface will be a single project naturally into multiple items, press each item separately. Consumers often feel elections such companies understand consumer, but don't know where the "maoerni": do the door sets, the door leaf and door sets, hinges and hardware as a separate item pricing, they tend to raise the price of each item by a fraction, consumers are aware that in this unconsciously overall price increase a lot. These subtle differences makes it easy for consumers to ignore. Furthermore the installation and paint the labor cost is also used as a chargeable content helps consumers make money again. Due to the expertise of the limit, consumers often do not recognize the secret, you can't say this quote is not reasonable, so it was only money. In fact, such a breakdown of the price is very easy to duplicate billing, makes the majority of consumers are "AZ" also know so. Especially if a decoration, decoration company came to call you to a discount or even lower, it must be careful. In the course of the construction, decoration company will gradually add project, and have its own loss earned.