【 Weak current college 】 budget experience (16)
Tendering parties use unbalanced quotation, the tendering party is not a fool, you can use the design change, let the bidding party despite its sympathy. As an example, you are not the basement reported high-priced well, my design change, two layers of a layer of basement; you're not digging reported low price, I make you more digging. It can be said that everything has to consult with the tender, encountered not clear, since the real settlement instructions. When quoting, or in accordance with the tendering party given by the list price. In this way, experiencing enlightened owners, will quite happily.
In quantities, when invitations to tender provided for in item quantities of different quantities should send a letter with party a contact, then there is a quote taken unbalanced quotation may, in accordance with the tender documents in a variety of ways, a comprehensive account of the contract, with a and b acceptable principles. If you want maximum profit, risk, and the specific circumstances of each company is different.
In large quantities and in terms of the tender for answering before, let the bidding party cannot change is the best, small quantity for price adjustment. case loss as far as possible to minimize it. personal feel tender side bidding project it is best not to the actual measurement of the change, you do not like the previous few friends saying is not possible to bid up. ....
For purposes of construction units, the list of tenders to be more difficult, for volume changes, and list the legal documents that comment in a careful study of the good solutions. For example, a list of tender party a list of tender offer for 100, 200, single aggregate 20000.
From the above if party a list of views for 200, with a view to the successful tender offer for 100, a single total still 20000. Actually this tender units also have great risk. If the actual amount of the final settlement is 150, press the first calculation of the clearing price of 100 × 200 + 50 × 200 = 30000
Press a second calculation of settlement price is 200 x 100-50 × 100 = 15000
This construction is very unfair. If party a list of potential collusion advisory units list volume, eventually rising to assume greater risks should be to reduce the price of winning the second construction units. Therefore need to be in phase with the list of annotations in the contracts or agreements specify that as the owner or advisory unit of the responsibility of the list of changes in the way of settlement. As: If the inventory quantity higher than the actual settlement amount of 30% when the settlement price of the bid price, and quantity of 1.5 times calculated according to the actual settlement calculation, etc.
As a bidder to review quantities
With the bid specification development, China from 1 July 2004, will start the full implementation of the construction projects resilience detailed list counts the price code, this is our engineering cost a large measure of reform, the separation of the quantity price, on the basis of the same project content, quality, level and on the basis of progress, reduce the construction cost.
However, in this pricing reform, whereas the preparation of the list becomes especially important to control cost. For quantities of quality, although there is a clear requirement specifications, but in the process due to the establishment of quantities varying levels of staff, as part of the compilation of the content is incomplete, the series has not been prepared, the part that has been left there to face; architectural engineering-oriented engineering, installation engineering workload relatively hours, sometimes non-installation preparation staffing installation project list appears leakage or access to a larger project. In this case, there are a lot of the tenderer, in the tender documents, not paying attention to review the quality of the list, just put the bid as a key that controls the price, bid, bid on may be owing to the fact that the list of issues, not only brings difficulties during the bid evaluation and construction contract to sign, the settlement had many difficulties.