Monday, April 25, 2011

【 Weak current College 】 preparing tenders common 115 error (1)



1. cover page
1, cover page format and tender documents requires consistent, if there is error in the printed text.
2. cover page section, whether or not the tender miles, mileage.
3. does the legal person or agent authorized in accordance with the provisions of the signature or seal is required with organization stamp, the tenderer's name and the credentials match the unit name.
4. bid said period is correct.
II. table of contents
5, directory content from order to text presentation is consistent with the requirements of the tender documents.
6, catalog number, page numbers, titles and content number, page number (Home), title.
3. tenders and tender Appendix
7. tender form, section, mileage is consistent with those contained in the tender documents, the tenders for the construction company name and company name are correct.
8, quote amount is "bid summary totals," and "bid summary table" and "comprehensive quote" case-sensitive uniform, consistent, international standard in the tender offer and whether they are consistent.
9. tender shown duration meets the requirements of the tender documents.
10, tender as approved in accordance with the requirements of the official seal.
11, legal representative or agent if required signature or seal.
12, tenders, period is correct, is shown with the cover sheet.
4. modify quoted statement (or the price differential)
13, modify the Declaration of whether content of quotations and bids are the same.
14, the price differential is the tender documents requires the binding or separate delivery.
5. powers of Attorney, bank guarantees, credit proof
15, Attorney, bank guarantees, credit that is in accordance with the tender documents required format.
16, these three are legal right signature or seal.
17, the agent is correct signature or seal.
18, power of attorney said period is correct.
19, delegate permissions meets the requirements of bidding documents, organization stamp stamped with perfection.
20, the amount of credit in the credit that is consistent with the express requirement, such as wild boar wild boar without express, is consistent with the percentage of the total price of the lot.
6. quote
21, quotation preparation instructions to comply with the requirements of bidding documents, simplified appropriately.
Whether in 22, quote table format requested in accordance with the tender documents, an item in the order form is correct.
23, "bid summary totals," and "bid summary table" and "comprehensive quote table" and other quote table is filled in in accordance with the provisions of the tender documents, preparing, auditing, bidders are signed as required.
24, "bid summary totals" and the "tender offer summary" of figures, is there an arithmetic error.
25, "bid summary" and "comprehensive quote tables" of figures, is there an arithmetic error.
26, "integrated quote table" price and "individual budget table" indicators, is there an arithmetic error. "Comprehensive quote table" costs are complete, especially when you want to change back and forth.
27, "individual budget tables" and "supplementary unit price analysis table" and "transport fees" unit price analysis tallies of the number, project number and tender quantities are the same, whether it is arithmetic error.
28, "added price analysis table" and "transport fees unit price analysis table" is too high, too low, the analysis of reasons, the labor, material, machine price is reasonable, accurate to avoid unbalanced quotation.
29, "" transport fees "unit price analysis table is consistent with the distance, the tender documents is consistent with the actual investigation.
30, plus auxiliary costs estimates with section design, drop forged close range meets the requirements of bidding documents, whether tenders other content of the description, the tender documents required by the price information is accurate and complete.
31, whether fixed form and construction organization plan arrangement of construction methods, the machines configured to coincide with the construction scheme, avoid tables with machines and machines configuration table appear big differences.
32, fixed measurement unit, quantity and price units, whether or not the project number.
33, "project list" table in the project content and form fixed.
34, summary of the "bid" and "quantity" automatic calculation using Excel tables, quantity x price is equal to the closing price (price according to the rounding rules on rounding). Total items in reverse unit price, price retained two decimal places.
7. the tender documents and contract term confirmation and commitments
35, tender commitments and whether the requirements in the tender documents.
36, commitments and tenders are consistent with other relevant content.
37, commitments are cover a tender all of their contents, are essentially responded to the entire contents of the tender documents and tender units. Wild boar in the tender documents in the underlying requirements of subcontracting, the tender file in substance whether to respond.
38, bidding documents required by article whether the contents of each commitment.
39, on the tender documents (including residual book) and contract term confirmation and commitments, are you sure you have all your content and all terms, can not only confirm, the main provisions that commitment term to exact, are not allowed to keep or have other drives.
VIII. construction organization and construction schedule
40, engineering survey is an accurate description.
41, plan on completion of the said period, meets the tender file duration arrangements and provisions, sub-item project stage duration, node duration meets the tender documents. Duration in advance to reasonable, appropriate measures, cannot advanceNever shop shelves in advance, such as project duration.
42, duration of narratives, construction, sequencing and the progress of the "image map", "bar graph" and "network" are the same, and in particular laying project duration to tailored carefully arranged, so as to avoid inconsistent with the actual situation.
43, overall deployment: construction team and key stakeholders and subsidy programmes are consistent with the Tribunal, narratives and "plan," "organization chart" and "staff resumes" and whether humanoid duties, etc.
44, construction plans and construction methods, technology match.
45, construction plans and tender documents, the tenders are consistent about commitment. Material supply is consistent with the Party of the request, whether uniform generation storage transportation, whether or not the supply or purchasing party. Temporary communication scheme is a requirement by the tender documents. (Requires overhead line, you cannot press the wireless quotes). Construction team number is provided in accordance with the tender documents.
46, project schedule: total duration meets the requirements of bidding documents, key project duration meets the requirements of the tender documents.
47, special projects, whether there is a special arrangement: in winter construction project measures to properly, its quality must lay-off, expansive soils during the rainy season to consider suspension of work, cross the bridge Foundation seasonal River before and during the process to complete, and the duration should be reasonable arrangements.
48, "network map" process arrangement is reasonable, the key line is correct.
49, "network map" If you want to interrupt, correctly indicated that the end of the project is returned to the appropriate location, virtual job is reasonable.
50, the "image progress chart," and "bar graph" and "network" in the project are complete: subgrade, bridges and culverts, rail or road, housing, and drainage and station equipment, the large Pro, etc.
51, "plan" is the tender documents assigned team of resident, construction sites and large temporary facilities location, resident, construction sites and large number of clinical engineering and engineering in occupies the number and text description.
52, labor, materials and machinery equipment, test instrumentation table are complete.
53, labor, materials are prepared in accordance with the tender requirements, quarter, month, year.
54, labor and labor curve tallies the total number of days, and the total days in the budget table number differences to be reasonable.
55, tenders constructional scheme, in the construction method description conforms to the design documents and bid request, the use of the data is consistent with the design.
56, construction methods and techniques of description conforms to current design standard and existing design standards.
57, flood control measures, if necessary, measures are strong, concrete and feasible.
58, security, fire-fighting measures and low season seasonal labour adjustment measures.
59, major works of the material quantity and budget tables and machines tab number tallies.
60, mechanical equipment, test instrumentation table device type, model, and construction methods, process consistency, quantity described meet project needs.