【 Weak current college 】 cost budget easily missed 100 item summary
1, in the flat roof insulation roof exhaust hole
2, stair railings in embedded iron
3, paint and varnish construction scaffold
4. prefabricated girder concrete: slab head concrete, transport, installation
5, bored pile: depth of drilled into rock (the projects of municipal and road fixed project contains content disparities)
6. indoor plumbing installation blowing easily missed
7. outdoor pipe installation of ultra high fees
8, fabrication and installation of steel angle and its main member fees
9, trench excavation of unilateral spoil easily missed coefficient
10, Sinotrans soil by artificial factor forget
11, cables, wires, etc on the list is only the net quantity provided that the group price has to be coupled with reserved, bending, loss, etc. length
12, in distribution cabinet installation list base type easily leak
13, drainage pipe installation list on casing easily leak
14, duct through wall sealing
15, control valve pressure flush temporary spool fabrication and installation.
16, equipment installation and hoisting machines and amortisation.
17, technology pipes installed in the flange bolts is not costing materials.
18, installation parts: increase in the cost of high-rise building base including 6 layer or all artificial 20m following. In high-rise buildings and at the same time meet the high construction, increased costs and high-rise buildings increased fee is very high.
19, roof line, the cover was mainly sporadic part!!
20, some sporadic, small widget concrete easy leakage;
21, roof sectional joints, particularly the overhead insulation layer, cement screed with sectional joints, but also in the insulation panels to be sectional joints;
22, some regulatory requirements is also easy to leak, for example: more than 5 metres long wall to create structural columns, wall height of more than 4 m of additional pressure beam when;
23, equipment installation and Horn, pipe installation bracket manufacture, installation, paint coating;
24. ventilation piping installation of canvas interface;
25, staircase, roof top scaffolding sectional joints, design and construction requirements in the notes a number of indoor and outdoor ad widget.
26, plastering tessellations caulking a corresponding fixed items, materials, should apply the appropriate item
27, plate negative reinforcement distribution rib is very easy to leak, because drawings did not reflection. In addition to looking at the following sites to see, no other way.
28, in digging project, now the price table, the digging of wet earth ** ** fee has not been factored into the (previously fixed is included), now included in measures project, that is, the twenty-first chapter of the construction of drainage, precipitation, pit sections. In preparation, don't forget!
29, various building expansion joints: roofing of the sectional joints, external walls and bulk water transfer of bituminous caulking
30, a prominent part of the structure column;
31, prefabricated cast strip between;
32, precast piles, piles, piles, piles, etc.
33, drill hole punching, steel casings, increased fees into rock, operating platforms, concrete is the use of underwater concrete pouring.
34, steel sheet pile play, separate set of item, allocated in the excavation work and on the job in the hole.
35, no detailed layout, but the drawings mentioned in the description of the project. Such as walls of the structure column, masonry reinforcement.
36, measure project costs of mass concrete temperature measurement.
37, civil works for loading presetting.
38, civil engineering inspection well, septic tank project such as a set of integrated fixed, don't miss one of the appropriate measures, such as digging drainage on wet soil, excavation and drainage and foot hand, templates, etc.
39, HVAC easy legacy project:
1) air duct valves, pressure tank, fan-coil back to bellows of insulation;
2) device ontology and pipe connection flanges;
3) roof water system pipe construction support Pier;
4) terminal equipment with vibration reduction measures.
40, contract file is not a piece of paper, including the tender documents, construction organization plan has a direct impact on measures of composition, in accordance with the standard construction is one of the contract. For example, tender by 24 hour continuous construction considerations, night time measures fees must consider, noise and environmental protection costs is not a simple rate, you can replace. Another example of design drawings shall comply with the requirements of PE pipes, but did not indicate what you want to take the roof section, press for PE pipe should be can't baoshai protection measures, it should consider the offers. In addition, in conformity with the specifications of the fixed and should be based on the specifications, because the acceptance to specification.
41, the list item and hanging under the convergence objective fixed child cannot control (including engineering calculation rule, the work content, etc.). Fixed a calculation rule, the list has a calculation rule, the two must be consistent. For example, someone mentioned several times in front of the pipeline trestle and wall bushing, press the list should be calculated, but Interior pipe installation fixed usually contains brackets and casing (with different around), and then repeat the calculation.
42, stair stone marking time slot easily missed, wall decoration different decoration materials joint treatment, ceiling fastening plate surrounding pressure line easy to leak.
43, construction inside: man-machine with a coefficient of digging, wet soil is also a factor. -Location of moisture-proof layer 0.06.
There are 44, civil something easy to remember, that is, bracing reinforced with horse stool, actual construction this is no small numbers, but annoying.
45, earth-moving categories and distance;
46, cave, basement, and so need lighting construction of artificial fee increase 40%;
47, structural column ring lintel template concrete calculations;
48, pipe pile core concrete, pile and test pile calculations, pipe pile length accrued pile tip length;
49, brick tail-1/4, 1/2 thick fixed by 900 consider, each more or less talent machine required adjustments;
50, pile-core round plate, such as embedded iron antirust paint brush, etc.
> 51, irregular plastering, drywall screw steel wire mesh, such as artificial increase;
52, plastering vertical height adjustment with super high plaster thickness;
53, electrical shaft bridge engineering statistics differ, the original design has no specific installation detail drawing, experience by budget officer under its own account. 54, tall plant installation fees used scaffolding. General steel structure not erection of scaffolding.
55, reinforced engineering pad can be counted in the reinforced Engineering? (in parts).
56, plastering of the fence, 2006 edition of Shandong province has separate consumption, enter directly the project item.
57, the scaffolding costs should be based on the approved construction organization design practices.
58, decoration in door of special hardware, particularly fire doors.
59, easy to put the outdoor terrace of the bottom surface plastering missed
60, easy leakage of mass concrete in a set of metal duct
61, different concrete level set when pouring fasteasy
62, doing a list item when the decoration is calculated according to the finish. Many of the projects appear to be complete, if not carefully watch the design drawings and specifications and tender documents for construction are very easy to leak, causing unreasonable price listing group.
63, plywood base such as tide fire and pest control, treatment is moisture-proof, stone stone, polished extruded edging pumping grooves and other detail treatment, light-coloured stone made floor more white cement. High ceiling crane reinforcement of support measures and protection, special decoration parts as designed when the desired reduction in material splicing of loss, etc.
64, beam high over 700MM and wall of bolt;
65, frame columns section of masonry reinforcement;
66, basic scaffolding
67, beam walls increase single scaffolding
68, exterior wall plastering tessellations caulked joint projects, the General is also easier for negligence.
69, scaffolding project paint brush size foot hand fee easily excluded.
70, aerated wall surface processing.
71, projection area of concrete works (stairs, balconies, etc.) in the concrete content greater than fixed content should be adjusted.
72, piping and control take professional interface portion of the source part may appear more calculation
73, scaffold of a removal easy leakage items
74, lighting lamps and lanterns costs and its installed ultra-high system debugging is very easy to forget
75, staircase of the preceding paragraph, the scaffold charges different bear below.
76, waterproof material additional layer thickness adjustment.
77, bulk water ointment filling
78, staircases embedded parts;
79, toilet wall of concrete flange (of course this class belongs to the partition problem, not part of the wall is factored in, but prepare the manifest that is a prominent issue OH);
80, basement project lighting costs;
81, parapet deformation seams of asphalt hemp yarn
82, embedded iron
83, a roof with chimney
84, which discharges at the balcony
85, manifest the tender offer, the pricing for a precast concrete unit, precast element embedded iron on
86, backfill soil excavation and soil;
87, digging (chamfer or digging) that transports the soil;
88, basic bedding;
89, wood production of paint;
90, brick Foundation tide level
91, earth-moving at the end of the artificial winding coefficient of difficulty;
92, outdoor, technology pipes installed cost of scaffolding;
93, steel structure welding of non-destructive testing;
94, process pipeline wall bushing sealing;
95, settlement observation point reinforced head and man-machine costs 96, aerated wall surface processing.
96, labor adjustment.
97, base on feet top coating.
98, fine stone concrete ground of concrete strength.
99, doors and Windows of the paint and hardware.
100, installation cable, welding gloves of main member price.